Chapter 56 – Board of Examiners for engineers and surveyors

 

SECTION .0100 ‑ ORGANIZATION OF BOARD

 

21 NCAC 56 .0101             IDENTIFICATION

The North Carolina State Board of Examiners for Engineers and Surveyors is hereinafter referred to as "the Board."

 

History Note:        Authority G.S. 89C‑10;

Eff. February 1, 1976;

Readopted Eff. September 29, 1977;

Amended Eff. August 1, 2000; April 1, 1989; January 1, 1982;

Pursuant to G.S. 150B-21.3A, rule is necessary without substantive public interest Eff. April 27, 2019.

 

21 NCAC 56 .0102             GENERAL PURPOSE OF BOARD

 

History Note:        Authority G.S. 89C‑2; 89C‑10; 89C‑13 to 89C‑17; 89C‑20 to 89C‑23;

Eff. February 1, 1976;

Readopted Eff. September 29, 1977;

Amended Eff. January 1, 1982;

Repealed Eff. April 1, 1989.

 

21 NCAC 56 .0103             ORGANIZATION

(a)  Board Committees. The Board shall be organized into an engineering committee, a land surveying committee and a continuing professional competency (CPC) committee. The engineering committee shall consist of the four engineer members and one public member. The land surveying committee shall consist of the three land surveyor members and one public member. The CPC committee shall consist of one engineer member, one land surveyor member and one public member. The Board chair shall appoint the chairs and members of each committee.

(b)  Executive Director. The executive director may be authorized by the Board or the chair to represent the Board before professional or governmental organizations when such representation serves to further and support the purposes of the Board and is made within the expressed policies of the Board or these Rules.

(c)  Actions by the Board. Actions taken by the Board shall be by majority vote of a quorum of the Board.

 

History Note:        Authority G.S. 89C-4; 89C-8; 89C-9; 89C-10; 89C‑11;

Eff. February 1, 1976;

Readopted Eff. September 29, 1977;

Amended Eff. September 1, 2009; August 1, 2000; August 1, 1998; April 1, 1989; January 1, 1982;

Pursuant to G.S. 150B-21.3A, rule is necessary without substantive public interest Eff. April 27, 2019.

 

21 NCAC 56 .0104             DESCRIPTION OF SEAL

The official seal adopted by the Board is the Great Seal of the State of North Carolina with the inscription of the Board name on the perimeter.

 

History Note:        Authority G.S. 89C‑10(b);

Eff. February 1, 1976;

Readopted Eff. September 29, 1977;

Amended Eff. August 1, 2000; August 1, 1998; January 1, 1982;

Pursuant to G.S. 150B-21.3A, rule is necessary without substantive public interest Eff. April 27, 2019.

 

SECTION .0200 ‑ BOARD PERSONNEL POLICIES AND WORK PLAN

 

 

21 NCAC 56 .0201             PHYSICAL QUALIFICATIONS

21 NCAC 56 .0202             HOURS OF WORK

21 NCAC 56 .0203             PAY PERIODS

21 NCAC 56 .0204             TRAVEL AND EXPENSE VOUCHERS

21 NCAC 56 .0205             OVERTIME

21 NCAC 56 .0206             ANNUAL VACATION

21 NCAC 56 .0207             HOLIDAYS

21 NCAC 56 .0208             SICK LEAVE

21 NCAC 56 .0209             COMPENSATORY TIME

21 NCAC 56 .0210             HOSPITALIZATION COVERAGE AND BENEFITS

21 NCAC 56 .0211             RETIREMENT COVERAGE AND BENEFITS

21 NCAC 56 .0212             SUBJECT TO CHANGE

 

History Note:        Authority G.S. 89C‑4; 89C‑5; 89C‑6; 89C‑9; 89C‑11;

Eff. February 1, 1976;

Readopted Eff. September 29, 1977;

Repealed Eff. December 1, 1984.

 

SECTION .0300 ‑ INSTRUCTIONAL PROGRAMS

 

 

21 NCAC 56 .0301             POLICY

21 NCAC 56 .0302             FINANCES

 

History Note:        Authority G.S. 89C‑10(g); 89C‑11;

Eff. February 1, 1976;

Readopted Eff. September 29, 1977;

Amended Eff. January 1, 1982;

Repealed Eff. April 1, 1989.

 

21 NCAC 56 .0303             DISBURSEMENT OF FUNDS

The Board may dispense funds for educational programs. Entities described in G.S. 89C-10(g) may request funds in writing and provide the following information:

(1)           The amount needed;

(2)           The intended use of the funds;

(3)           Subject material to be presented and qualifications of instructors to be employed;

(4)           Itemized breakdown of the amount needed and the total expected costs; and

(5)           Source and amount of assistance being given by any other person or organization.

 

History Note:        Authority G.S. 89C‑10(g);

Eff. February 1, 1976;

Readopted Eff. September 29, 1977;

Amended Eff. April 1, 1989; January 1, 1982;

Pursuant to G.S. 150B-21.3A, rule is necessary without substantive public interest Eff. April 27, 2019;

Amended Eff. March 1, 2023; July 1, 2020.

 

21 NCAC 56 .0304             SUSPENSION OF AUTHORITY TO EXPEND FUNDS

In the event that the Board's authority to expend funds is suspended pursuant to G.S. 93B-2(d), the Board shall continue to issue and renew licenses and collect all fees set forth in G.S. 89C-14, 89C-17, and 89C-24. The Board shall maintain an escrow account into which any fees tendered during the Board's period of suspension shall be deposited. Once the Board's authority is restored, the funds shall be moved from the escrow account into the general operating account.

 

History Note:        Authority G.S. 89C-10; 89C-11; 93B-2;

Eff. July 1, 2020.

 

SECTION .0400 ‑ RECORDS AND REPORTS OF BOARD: RETENTION AND DISPOSITION

 

21 NCAC 56 .0401             RECORDS OF BOARD PROCEEDINGS

Records of all proceedings of the Board such as rule-making proceedings, declaratory rulings and contested cases and all other records are retained at the office of the Board or are disposed of in accordance with the records retention and disposition schedule filed with the Department of Cultural Resources.

 

History Note:        Authority G.S. 89C‑10(a); 89C‑12;

Eff. February 1, 1976;

Readopted Eff. September 29, 1977;

Amended Eff. August 1, 2011; August 1, 1998; April 1, 1989; January 1, 1982;

Pursuant to G.S. 150B-21.3A, rule is necessary without substantive public interest Eff. April 27, 2019.

 

21 NCAC 56 .0402             RECORDS OF APPLICATIONS

All records of applications for licensure which are active are retained at the office of the Board. However, application files once submitted to the Board are Board property and are not returnable. During the time records are physically held in the Board office an applicant can obtain a copy of the application form by request to the Board office. Inactive applications shall be destroyed after one year after giving 30 day notice to the last known address of the applicant, upon approval of the Department of Cultural Resources in accordance with G.S. 121-5.

 

History Note:        Authority G.S. 89C‑10(a); 89C‑12;

Eff. February 1, 1976;

Readopted Eff. September 29, 1977;

Amended Eff. July 1, 2009; August 1, 2000; January 1, 1982.

Pursuant to G.S. 150B-21.3A, rule is necessary without substantive public interest Eff. April 27, 2019.

 

21 NCAC 56 .0403             APPLICATION FILES

 

History Note:        Authority G.S. 89C‑10(a); 89C‑12;

Eff. February 1, 1976;

Readopted Eff. September 29, 1977;

Amended Eff. May 1, 1994; April 1, 1989; January 1, 1982;

Repealed Eff. August 1, 1998.

 

21 NCAC 56 .0404             DESTRUCTION OF APPLICATION FILES

21 NCAC 56 .0405             REACTIVATION OF APPLICATION FILE

 

History Note:        Authority G.S. 89C‑10(a); 89C‑12;

Eff. February 7, 1976;

Readopted Eff. September 29, 1977;

Amended Eff. April 1, 1989; January 1, 1982;

Repealed Eff. August 1, 1998.

 

SECTION .0500 ‑ PROFESSIONAL ENGINEER

 

21 NCAC 56 .0501             REQUIREMENTS FOR LICENSING

(a)  Education. The Board shall consider the education of an applicant in determining eligibility for licensing as a Professional Engineer. The terms used by the Board for the educational requirements in G.S. 89C-13(a1) to be eligible to be licensed as a Professional Engineer are defined as follows:

(1)           "Engineering curriculum of four or more years approved by the Board" is defined as a program that has been accredited by the Engineering Accreditation Commission (EAC) of the Accreditation Board for Engineering and Technology (ABET). This program is incorporated by reference including subsequent amendments and editions. This material is available at www.abet.org/accreditation-criteria-policies-documents/ at no cost, or for inspection at the office of the North Carolina Board of Examiners for Engineers and Surveyors. Copies may be obtained at the Board office at a cost of five dollars ($5.00) per copy.

(2)           "Engineering or related science curriculum of four or more years other than ones approved by the Board" is defined as a curriculum, although not accredited by ABET, of technical courses that contains engineering or scientific principles.

(3)           "Equivalent education satisfactory to the board" is defined as:

(A)          A graduate degree in Engineering from an institution where the same discipline undergraduate engineering program has been accredited by ABET (EAC) shall be considered equivalent to an engineering curriculum of four or more years approved by the Board.

(B)          A bachelor's degree in Engineering Technology, whether or not accredited by the Technology Accreditation Commission (TAC) of ABET, shall be considered equivalent to an engineering or related science curriculum of four or more years other than one approved by the Board.

(C)          Foreign degrees shall be considered equivalent only after receipt of an evaluation report that the degree is substantially equivalent to an EAC/ABET accredited engineering curriculum from the Center for Professional Engineering Education Services, an affiliate of the National Council of Examiners for Engineering and Surveying (NCEES), or from the American Association of Collegiate Registrars and Admissions Officers (AACRAO). The Board shall equate the degree to an EAC/ABET accredited engineering curriculum of four or more years approved by the Board in Subparagraph (a)(1) of this Rule if it receives a substantially equivalent evaluation.

(b)  Experience. The experience of an applicant shall be considered in determining whether an applicant is eligible to be licensed as a Professional Engineer.

(1)           Required Experience. In evaluating the work experience required, the Board shall consider the total experience record and the progressive nature of the record. Experience shall be of a progressive engineering nature obtained after graduation from a program that meets the criteria set forth in Paragraph (a) of this Rule. Not less than half of required engineering experience shall be of a professional grade and character, and shall be performed under the responsible charge of a licensed Professional Engineer, or if not, the applicant shall submit a written explanation to the Board explaining why the experience should be considered acceptable. The Board shall approve the experience on a case-by-case basis if it is satisfied of the grade and character of the progressive experience. Experience gained under the technical supervision of an unlicensed individual shall be considered based upon the engineering education and experience credentials of the unlicensed supervisor. Experience gained in the armed services, typically while serving in an engineering or engineering related group, shall be accepted only if substantially equivalent to civilian work.

(2)           Definition. The word "progressive" in the terms "progressive nature of the record," "progressive engineering experience," "progressive land surveying," "progressive engineering nature," or "progressive experience on engineering projects" means that during the period of time that an applicant made a practical utilization of acquired knowledge and continuous improvement, growth, and development have been shown in the utilization of that knowledge as revealed in the complexity and technical detail of the work product or work record. The applicant shall show continuous assumption of greater individual responsibility for the work product over that period of time. The progressive experience on engineering projects shall be of a grade and a character that shows the Board that the applicant is competent to practice engineering.

(3)           Credit for Experience. In evaluating progressive engineering experience, the Board shall give credit for experience in the following areas of work:

(A)          Graduate schooling or research in an engineering program resulting in award of a master's degree from an institution that offers EAC/ABET-accredited programs – one year;

(B)          Graduate schooling or research in an engineering program resulting in award of an earned doctoral degree in engineering from an institution that offers EAC/ABET-accredited programs – two years, with or without a master's degree, but this includes the one year for the master's degree, if obtained;

(C)          Progressive land surveying - maximum two years; and

(D)          Teaching of engineering subjects at the university level in an engineering program offering a four-year or more degree approved by the Board.

The Board shall not accept combinations of the categories in this Subparagraph as fulfilling all the necessary statutory experience requirements. Every applicant for licensure as a Professional Engineer, as part of the total experience requirement, shall show a minimum of one year experience of a progressive engineering nature in industry, government, or under a licensed Professional Engineer offering service to the public.

Full-time engineering faculty members who teach in an engineering program offering a four-year or more degree approved by the Board may request and shall be granted waiver of the minimum one year experience in industry, government, or private practice if they demonstrate consulting or research work of at least one year's duration, which was pursued to completion of the project, and that is of a progressive engineering nature. The faculty applicant shall document the work to evidence that the work meets the Board's requirement.

(4)           An exception to the requirement in Subparagraph (b)(1) of this Rule that experience be obtained after graduation is for long-established practice of 20 years or more, as provided for in G.S. 89C-13(a3).

(5)           Other experience is considered if it is:

(A)          Experience obtained prior to graduation as part of an ABET accredited engineering program shown on the transcript, with a maximum credit of one year; or

(B)          Experience obtained in a foreign country that is performed under direct supervision of a Professional Engineer licensed with a member Board of the National Council of Examiners for Engineering and Surveying (NCEES).

 

History Note:        Authority G.S. 89C-10; 89C-13;

Eff. February 1, 1976;

Readopted Eff. September 29, 1977;

Amended Eff. August 1, 2014; August 1, 2011; May 1, 2009; August 1, 2002; August 1, 2000; August 1, 1998; November 2, 1992; April 1, 1989; January 1, 1982;

Pursuant to G.S. 150B-21.3A, rule is necessary without substantive public interest Eff. April 27, 2019;

Amended Eff. July 1, 2020.

 

21 NCAC 56 .0502             APPLICATION PROCEDURE: INDIVIDUAL

(a)  General. A person desiring to become licensed as a Professional Engineer must make application to the Board on a form prescribed and furnished by the Board.

(b)  Request. A request for an appropriate application form may be made to the Board office or obtained from the website.

(c)  Applicable Forms:

(1)           Engineer Intern Certification Form. After passing the fundamentals of engineering examination an applicant may make application to the Board to become certified as an "Engineer Intern." This form requires the applicant to set forth personal history, educational background, engineering experience, and character references. A passport-type photographic quality portrait that is adequate for current identification purposes is also required.

(2)           Professional Engineer Form:

(A)          All persons, including comity applicants and certified Engineer Interns, shall apply for licensure using the Professional Engineer form. The submission of this form shall signify that the applicant seeks licensure, and shall result in seating for the principles and practice of engineering examination, when the applicant has met the requirements as set out in Rule .0501 of this Section. This form requires the applicant to set forth personal and educational background, engineering experience and character references. A passport-type photographic quality portrait that is adequate for current identification purposes is required.

(B)          Persons who previously completed the fundamentals examination by use of the Engineering Intern Certification Form shall submit the Professional Engineer Certification Form to request licensure when qualified to take the examination.

(3)           Supplemental Form. Persons who initially applied for the fundamentals of engineering exam using the Professional Engineer form shall supplement the initial application with this form upon applying for the principles and practice examination. The supplemental form requires that engineering experience from the date of the initial application until the date of the supplemental application be listed. Five references shall be submitted that are current to within one year of the examination date.

(4)           Reference Forms:

(A)          Persons applying for certification as an Engineer Intern shall submit to the Board names of three individuals who are familiar with the applicant's work, character and reputation, one of whom is a professional engineer. Persons applying to take the examination for principles and practice of engineering shall submit to the Board names of five individuals who are familiar with the applicant's work, character and reputation. Three of these individuals shall be Professional Engineers.

(B)          In addition to the applicant submitting names to the Board of individuals familiar with the applicant's work, character and reputation, those individuals listed shall submit to the Board their evaluations of the applicant on forms supplied to them by the applicant.

(C)          The reference form requires the individual evaluating the applicant to state the evaluating individual's profession, knowledge of the applicant and information concerning the applicant's engineering experience, character and reputation.

(D)          The Board shall provide the reference forms to the applicant with the application. The reference forms shall then be distributed by the applicant to the persons listed on the application as references. The applicant shall ensure that the individuals listed as references return the reference forms to the Board prior to the filing deadline for the examination.

(d)  Fees:

(1)           Engineer Intern Certification Form. Once the applicant passes the examination on the fundamentals of engineering and makes application to the Board to become certified as an "Engineer Intern" the application fee of one hundred dollars ($100.00) is payable.

(2)           Professional Engineer Form. The application fee of one hundred dollars ($100.00) is payable with the filing of the application.

(3)           Comity. The licensure fee of one hundred dollars ($100.00) is payable with the filing of the application.

(4)           Examination. The examination fee for any applicant is payable to the National Council of Examiners for Engineering and Surveying (NCEES) at the time of registering to take the exam in accordance with G.S. 89C-14.

(e)  The Board shall accept the records maintained by the National Council of Examiners for Engineering and Surveying (NCEES) as evidence of licensure in another state. For comity licensure, the NCEES record shall be accepted in lieu of completing the experience, education and references sections of the application. A comity application, with or without a NCEES record, shall be administratively approved by the Executive Director based upon evidence of current licensure in another jurisdiction based on comparable qualifications, required references and no record of disciplinary action, without waiting for the next regular meeting of the Board at which time the action shall be reported to the Board for final approval.

(f)  Model Law Engineer. The term "Model Law Engineer" refers to a person who meets the requirements of this Section by meeting the requirements of NCEES and has a current NCEES record on file and is designated as a "Model Law Engineer." A "Model Law Engineer" application shall be administratively approved by the Executive Director based upon the designation, without waiting for the next regular meeting of the Board at which time the action shall be reported to the Board for final approval.

(g)  Personal interview. During the application process, the applicant may be interviewed by the Board members if the members have questions regarding the applicant's education, experience or character, based upon the information submitted in the application.

 

History Note:        Authority G.S. 89C‑10; 89C‑13; 89C‑14; 89C-15;

Eff. February 1, 1976;

Readopted Eff. September 29, 1977;

Amended Eff. May 1, 1994; November 2, 1992; April 1, 1989; December 1, 1984;

RRC Objection due to lack of Statutory Authority Eff. November 17, 1994;

Amended Eff. August 1, 2014; May 1, 2009; August 1, 2002; August 1, 2000; August 1, 1998; January 1, 1995;

Pursuant to G.S. 150B-21.3A, rule is necessary without substantive public interest Eff. April 27, 2019.

 

21 NCAC 56 .0503             EXAMINATIONS

(a)  The Board offers the following examinations that are the national examinations of the National Council of Examiners for Engineering and Surveying (NCEES) with application made directly to NCEES to take the exam:

(1)           Fundamentals of Engineering (FE): This examination is designed to test the applicant's proficiency and knowledge of the fundamentals of engineering; and

(2)           Principles and Practice of Engineering (PE): This examination is designed to test the applicant's proficiency and knowledge of engineering principles and practices.

(b)  Examination Aids. Examinees may utilize examination aids as specified and published by NCEES.

(c)  Examination Sequence. Before the applicant shall be permitted to be examined on the principles and practice of engineering, the applicant shall pass the examination on the fundamentals of engineering, unless the applicant can provide evidence of 20 years of progressive engineering experience, or is a full-time engineering faculty member, or possesses an earned doctoral degree in engineering. NCEES administers the fundamentals of engineering examination as a computer-based exam.

(d)  Only those applicants who have met the education requirements as set forth in Rule .0501(a) of this Section, and have passed the FE exam may sit for the PE exam prior to gaining the required experience. Upon gaining the required experience, as set forth in Rule .0501(b) of this Section, an applicant may apply for the PE license.

(e)  Reasonable Accommodation. An applicant may make a written request to NCEES, before the application deadline, for reasonable accommodation for the exam. Reasonable accommodation shall be granted based upon meeting the Guidelines for Requesting Religious and ADA Accommodations published by the National Council of Examiners for Engineering and Surveying (NCEES).

(f)  Exam Results. Exam results shall be supplied in writing as pass or fail. No results will be given in any other manner.

(g)  Review of Failed Exams. An applicant who fails to make a passing score on an exam shall receive an exam analysis by NCEES.

 

History Note:        Authority G.S. 89C-10; 89C-13; 89C-14; 89C-15;

Eff. February 1, 1976;

Readopted Eff. September 29, 1977;

Amended Eff. August 1, 2014; September 1, 2009; May 1, 2009; April 1, 2001; August 1, 1998; November 2, 1992; April 1, 1989; January 1, 1982;

Pursuant to G.S. 150B-21.3A, rule is necessary without substantive public interest Eff. April 27, 2019;

Amended Eff. July 1, 2020.

 

21 NCAC 56 .0504             CERTIFICATES

 

History Note:        Authority G.S. 89C‑3; 89C‑13; 89C‑15; 89C‑16;

Eff. February 1, 1976;

Readopted Eff. September 29, 1977;

Amended Eff. January 1, 1982;

Repealed Eff. April 1, 1989.

 

21 NCAC 56 .0505             EXPIRATIONS AND RENEWALS OF CERTIFICATES

(a)  Professional Engineer Licensure. An annual renewal fee of seventy-five dollars ($75.00) for certificates of licensure for Professional Engineers shall be payable to the Board. The Board shall provide each licensed Professional Engineer a form that requires the licensee to provide the Board the physical places of business and residential addresses, report compliance with continuing education requirements, and report criminal convictions or disciplinary actions. The licensee shall give notice to the Board of a change of business or residential address within 30 days of the change. The licensee shall give notice to the Board of any criminal convictions, including DWI but not including minor traffic offenses (offenses that are not a misdemeanor or felony) or of any disciplinary actions in any jurisdiction on any license, within 30 days of the conviction or disciplinary action. A nolo contendere plea is equated to a conviction for reporting purposes.

(b)  Engineering Intern Certificate. The Engineering Intern certificate does not expire and, therefore, does not have to be renewed.

(c)  "Professional Engineer, Retired." The Board shall approve the application for use of the title for a person who has been duly licensed as a professional engineer by the Board, who chooses to relinquish or not to renew a license and has had no disciplinary action or criminal conviction that would support a determination that the licensee is not of good character and reputation.

 

History Note:        Authority G.S. 89C-10; 89C-17; 89C-3(8a);

Eff. February 1, 1976;

Readopted Eff. September 29, 1977;

Amended Eff. August 1, 2011; July 1, 2010; July 1, 2009; December 4, 2002; August 1, 2000; August 1, 1998; May 1, 1994;

Pursuant to G.S. 150B-21.3A, rule is necessary without substantive public interest Eff. April 27, 2019.

 

21 NCAC 56 .0506             waiver for licensees serving on active duty in the armed forces of the us

(a)  All Professional Engineers currently licensed by and in good standing with the Board (whose license is not suspended or revoked) who are serving in the armed forces of the United States and who are eligible for an extension of time to file a tax return pursuant to G.S. 105-249.2 are granted a waiver of their mandatory continuing education requirements and annual renewal fee for the time period disregarded pursuant to the Internal Revenue Code 26 U.S.C. 7508.

(b)  Request for waiver by an eligible licensee, meeting requirements in Paragraph (a) of this Rule, of renewal fee and waiver of continuing education requirements:

(1)           The licensee shall notify the Board of eligibility before the current license expires. Upon such notification, the Board shall maintain the license in active status through the extension period.

(2)           If the licensee fails to notify the Board of eligibility for the extension period before the current license expires, upon receipt and acceptance of a renewal application within the extension period and presentation of proof that the licensee was eligible on the date that is the deadline for renewal, the expired license or registration shall be deemed retroactively to have not expired.

(3)           The licensee who submits a renewal application within the extension period shall not be deemed to hold a lapsed license subject to reinstatement fees.

(4)           The licensee may renew the license within the extension period despite failing to complete the specified continuing education requirements.

(5)           A licensee shall provide proof of eligibility for the extension period when the licensee or registrant submits the renewal application.

 

History Note:        Authority G.S. 89C-10; 89C-17; 93B-15;

Eff. August 1, 2011;

Pursuant to G.S. 150B-21.3A, rule is necessary without substantive public interest Eff. April 27, 2019.

 

SECTION .0600 - PROFESSIONAL LAND SURVEYOR

 

21 NCAC 56 .0601             REQUIREMENTS FOR LICENSING

(a)  Education. The terms used by the Board for the specific education requirements to be eligible to be licensed as a Professional Land Surveyor are defined as follows:

(1)           "Bachelor of Science degree in surveying or other equivalent curriculum." These degrees shall contain a minimum of 45 semester hours, or their quarter‑hour equivalents. Of the 45 semester hours, a minimum of 12 semester hours of surveying fundamentals, 12 semester hours of applied surveying practice, and 12 semester hours of advanced or theoretical surveying courses are required. The remainder of the required surveying courses may be elective‑type courses in any of the categories; and

(2)           "Associate degree in surveying technology." This degree shall contain a minimum of 20 semester hours, or quarter-hour equivalents. Courses, completed with a passing grade, shall be in surveying fundamentals, applied surveying practice and advanced or theoretical surveying courses, including courses in surveying practices, subdivision design and planning, surface drainage, and photogrammetry.

(3)           "Land Surveyor Apprenticeship." The applicant shall have completed one of the following:

(A)          Certified Survey Technician Program (CST) of the National Society of Surveyors (NSPS) levels I through IV.

(B)          "Technologist" Certification Program of the American Society for Photogrammetry and Remote Sensing (ASPRS).

(C)          The Surveying Education Standard of the National Council of Examiners for Engineering and Surveying (NCEES) by obtaining college semester credit hours, as modified to require the following 39 college semester hours:

(i)            Twelve college semester hours in mathematics beyond basic mathematics, but the credits include college algebra or higher mathematics. These courses must emphasize mathematical concepts and principles rather than computation. Course examples include college algebra, trigonometry, analytic geometry, differential and integral calculus, linear algebra, numerical analysis, probability and statistics, and advanced calculus; and

(ii)           Twenty-seven college semester hours of surveying science and surveying practice. Courses shall be taught by surveying faculty qualified by education, training or experience to teach the subject matter. Examples of courses are basic surveying, route surveying, geodesy, geographic information systems, land development design and planning, global positioning systems, photogrammetry, mapping, legal principles of land surveying, boundary law, professional surveying and mapping, and remote sensing. Graduate-level surveying courses can be included to fulfill curricular requirements in this area.

(D)          Apprenticeship program, administered through ApprenticeshipNC, or equivalent administrator, approved by the Board, as including elements equivalent to Parts (A), (B), or (C) of this Subparagraph.

(b)  Experience:

(1)           Definition. As used in the North Carolina Engineering and Land Surveying Act, the term "progressive practical experience" means that during the period of time in which an applicant made a practical utilization of the knowledge of the principles of geometry and trigonometry in determining the shape, boundaries, position, and extent of the earth's surface, a continuous improvement, growth, and development in the utilization of that knowledge have been shown. In addition, the applicant shall show the continuous assumption of greater individual responsibility for the work product over that period of time.

(2)           Required Experience. In evaluating the work experience required, the Board shall consider the total experience record and the progressive nature of the record. Not less than half of the required land surveying experience shall be of a professional grade and character, and shall be performed under the responsible charge of a Professional Land Surveyor. If the work was not under the responsible charge of a Professional Land Surveyor, the applicant shall submit a written explanation to the Board explaining why the experience should be considered. The Board shall approve the experience on a case-by-case basis if it is satisfied of the grade and character of the progressive experience. Experience gained under the technical supervision of an unlicensed individual shall be considered based upon the engineering education and experience credential of the unlicensed supervisor. Experience gained in the armed services, typically while serving in an engineering or surveying related group, shall be accepted only if substantially equivalent to that which would have been gained in civilian work.

(3)           Other Experience. The applicant shall document the nature and details of the work done in the following areas to evidence to the Board its equivalency to land surveying:

(A)          construction layout;

(B)          engineering surveying; or

(C)          part‑time surveying work.

(c)  Exhibits, Drawings, Maps:

(1)           Required Exhibit Before Principles and Practice of Surveying Examination:

(A)          General. The applicant shall submit, along with the application, an actual map of a boundary survey of an actual project prepared under the direct supervision and responsible charge of a Professional Land Surveyor who states that the applicant did the preparatory work of the survey; that shows, by its conformance, that the applicant is knowledgeable of the contents of the Standards of Practice for Land Surveying in North Carolina as set forth in Section .1600 of this Chapter; and that shows that the applicant is able to apply this knowledge by preparing a map in accordance with the various legal and professional requirements of land surveying.

(B)          Physical Requirement. The map submitted shall be a clean, clear, legible print of an original map in the file of a Professional Land Surveyor.

(C)          Specific Requirements. The details that shall be evaluated are those applicable to the particular project as described in the Standards of Practice for Land Surveying in North Carolina as set forth in Section .1600 of this Chapter, and as described in G.S. 47‑30. In addition, the exhibit shall contain a statement that the field work, calculation, and mapping were performed by the applicant under the supervision of a Professional Land Surveyor, attested to by that Professional Land Surveyor.

(2)           Requirements for Comity Applicant. The map submitted by an applicant under comity may be a representative map of an actual survey of a project or work performed in the state of licensure that is modified to meet the requirements in Subparagraph (c)(2) of this Rule and shall be evaluated in accordance with the requirements applicable to the particular project as described in the Standards of Practice for Land Surveying in North Carolina as set forth in Section .1600 of this Chapter, and as described in G.S. 47-30.

 

History Note:        Authority G.S. 89C‑10; 89C‑13;

Eff. February 1, 1976;

Readopted Eff. September 29, 1977;

Amended Eff. August 1, 2014; July 1, 2009; August 1, 2000; August 1, 1998; November 2, 1992; April 1, 1989; December 1, 1984; January 1, 1982;

Pursuant to G.S. 150B-21.3A, rule is necessary without substantive public interest Eff. April 27, 2019;

Amended Eff. July 1, 2020;

Temporary Amendment Eff. July 1, 2022;

Amended Eff. March 1, 2023.

 

21 NCAC 56 .0602             APPLICATION PROCEDURE: INDIVIDUAL

(a)  General. A person desiring to become a Professional Land Surveyor must make application to the Board on a form prescribed and furnished by the Board.

(b)  Request. A request for the application form may be made to the Board office or obtained from the website.

(c)  Application Forms:

(1)           Surveyor Intern Certification Form. After passing the fundamentals of surveying examination an applicant may make application to the Board to become certified as a "Land Surveyor Intern." This form requires the applicant to set forth personal history, educational background, surveying experience, character references and exhibit. A passport-type photographic quality portrait that is adequate for current identification purposes is also required.

(2)           Professional Land Surveyor Form:

(A)          All persons, including comity applicants and certified Land Surveyor Interns, shall apply for licensure using the Professional Land Surveyor form. The submission of this form shall signify that the applicant seeks licensure, and shall result in seating for the principles and practice of surveying examination, when the applicant has met the requirements as set out in Rule .0601 of this Section. This form requires the applicant to set forth personal and educational background, surveying experience, character references and exhibit. A passport-type photographic quality portrait that is adequate for current identification purposes is also required.

(B)          Persons who have previously completed the fundamentals examination by use of the Land Surveying Intern Application Form shall submit the Professional Land Surveyor Application Form to request licensure when qualified to take the examination.

(d)  Supplemental Form. Persons who applied for licensure as a land surveyor, but were not eligible to be admitted to the examination for principles and practice of surveying shall supplement their initial applications upon applying for the examination. The applicant shall supplement the initial application by using the supplemental form, which requires the listing of land surveying experience from the date of the initial application to the date of the supplemental application. Five references shall be submitted that are current to within one year of the examination date.

(e)  Reference Forms:

(1)           Persons applying to be certified as a Surveyor Intern or to take the examination for principles and practice shall submit to the Board names of individuals who are familiar with the applicant's work, character and reputation. The names shall be submitted by the applicant on the application form.

(2)           Persons applying for certification as a Surveyor Intern must submit three references, one of whom shall be a Professional Land Surveyor. Persons applying for the principles and practice examination shall submit five references, three of whom shall be Professional Land Surveyors.

(3)           In addition to the applicant submitting names to the Board of such individuals, those individuals shall submit to the Board their evaluations of the applicant on reference forms supplied them by the applicant.

(4)           The reference form requires the individual evaluating the applicant to state the evaluating individual's profession, knowledge of the applicant and information concerning the applicant's land surveying experience, character and reputation.

(5)           The Board shall provide the reference forms to the applicant along with the application for licensure. The reference forms shall then be distributed by the applicant to the persons listed on the application as references. The applicant shall ensure that the individuals listed as references return the forms to the Board prior to the filing deadline for the examination applied for by the applicant.

(f)  Fees:

(1)           Land Surveyor Intern Certification Form. Once the applicant passes the examination on the fundamentals of surveying and makes application to the Board to become certified as a "Land Surveyor Intern" the application fee of one hundred dollars ($100.00) is payable.

(2)           Professional Land Surveyor Form. The application fee of one hundred dollars ($100.00) and examination fee for those applying for licensure based upon examination, experience, character and exhibit are payable with the filing of the application.

(3)           Comity. The licensure fee of one hundred dollars ($100.00) and appropriate examination fee for those applying for licensure based upon comity are payable with the filing of the application.

(4)           Examination. The examination fee for any applicant shall be payable to the National Council of Examiners for Engineering and Surveying (NCEES) at the time of registering to take the exam in accordance with G.S. 89C-14.

(g)  The Board shall accept the records maintained by the National Council of Examiners for Engineering and Surveying (NCEES) as evidence of licensure, in another state. For comity licensure the NCEES record shall be accepted in lieu of completing the experience, education and references sections of the application. A comity application, with or without a NCEES record, shall be administratively approved by the Executive Director based upon evidence of current licensure in another jurisdiction based on comparable qualifications, required references, and having passed the two-hour North Carolina portion of the exam and no record of disciplinary action, without waiting for the next regular meeting of the Board. At that time the action shall be reported to the Board for final approval.

(h)  Personal Interview. During the application process, the applicant may be interviewed by Board members if the members have questions regarding the applicant's education, experience or character, based upon the information submitted in the application.

 

History Note:        Authority G.S. 89C-10; 89C-13; 89C-14; 89C-15;

Eff. February 1, 1976;

Readopted Eff. September 29, 1977;

Amended Eff. August 1, 2014; May 1, 2009; August 1, 2002; August 1, 2000; August 1, 1998; May 1, 1994; April 1, 1989; January 1, 1982;

Pursuant to G.S. 150B-21.3A, rule is necessary without substantive public interest Eff. April 27, 2019.

 

21 NCAC 56 .0603             EXAMINATIONS

(a)  The Board offers the following examinations that are the national examinations of the National Council of Examiners for Engineering and Surveying (NCEES) with application made directly to NCEES to take the exam:

(1)           Fundamentals of Surveying (FS): This examination is designed to test the applicant's proficiency and knowledge of the fundamentals of surveying. (Reference to Fundamentals of Surveying is the revised name of the national exam that is the Fundamentals of Land Surveying in G.S. 89C); and

(2)           Principles and Practice of Surveying. This examination is designed to test the applicant's proficiency and knowledge of land surveying practices and procedures generally and specifically within North Carolina. (Reference to Principles and Practice of Surveying is the revised name of the national exam that is the Principles and Practice of Land Surveying in G.S. 89C).

(b)  State-Specific Exam. The State-specific portion of the principles and practice of surveying examination shall be provided by the Board.

(1)           Examination Filing Deadline. The applicant who wishes to take the State-specific portion of the principles and practice of surveying examination shall deliver the completed application, including all necessary references, transcripts, and verifications, to the Board office at least 60 days prior to the date for taking the exam.

(2)           Unexcused Absences. For the State-specific portion of the principles and practices of surveying examination, after a seating notice for a scheduled examination has been issued, if applicant fails to appear, the applicant's record shall reflect "unexcused absence," unless the absence was for jury duty or the applicant was not physically able to be present, as indicated by a doctor's certificate. The examination fee shall be forfeited if the applicant's record reflects an unexcused absence.

(3)           Re-Examination. A person who failed the State-specific portion of the principles and practices of surveying examination may apply to take the examination again at the after a six-month waiting period by making written request and submitting the required exam fee. A person having a combined record of three failures shall be eligible only after submitting a new application with appropriate application fee, and shall be considered by the Board for re-examination at the end of 12 months after the last failure.

(c)  Examination Aids. Examinees may utilize examination aids as specified and published by NCEES or the Board.

(d)  Preparation of Examination. NCEES administers the fundamentals of surveying examination and the examination in the principles and practice of surveying as computer-based exams.

(e)  Reasonable Accommodation. An applicant may make a written request to NCEES, before the application deadline, for reasonable accommodation for the exam. Reasonable accommodation shall be granted based upon meeting the Guidelines for Requesting Religious and ADA Accommodations published by the National Council of Examiners for Engineering and Surveying (NCEES).

(f)  Exam Results. Exam results shall be supplied in writing as pass or fail. No results shall be given in any other manner.

(g)  Review of Failed Exams. An applicant who fails to make a passing score on an NCEES exam shall receive an exam analysis by NCEES. An applicant who fails to make a passing score on the two-hour state-specific portion of the exam may request in writing within 30 days of receiving the result to have an opportunity to review that portion of the exam. The review shall be done in the Board office under supervision of staff and is limited to one hour.

 

History Note:        Authority G.S. 89C-10; 89C-15;

Eff. February 1, 1976;

Readopted Eff. September 29, 1977;

Amended Eff. August 1, 2014; May 1, 2009; April 1, 2001; August 1, 1998; November 2, 1992; April 1, 1989; January 1, 1982;

Pursuant to G.S. 150B-21.3A, rule is necessary without substantive public interest Eff. April 27, 2019;

Amended Eff. July 1, 2020.

 

21 NCAC 56 .0604             STANDARDS OF PRACTICE

 

History Note:        Authority G.S. 89C‑10; 89C‑21;

Eff. February 1, 1976;

Readopted Eff. September 29, 1977;

Amended Eff. January 1, 1982;

Repealed Eff. July 1, 1989.

 

21 NCAC 56 .0605             CERTIFICATES

 

History Note:        Authority G.S. 89C‑3; 89C‑13; 89C‑15; 89C‑16;

Eff. February 1, 1976;

Readopted Eff. September 29, 1977;

Amended Eff. January 1, 1982;

Repealed Eff. April 1, 1989.

 

21 NCAC 56 .0606             EXPIRATIONS AND RENEWALS OF CERTIFICATES

(a)  Professional Land Surveyor Licensure. An annual renewal fee of seventy-five dollars ($75.00) for certificates of licensure for Professional Land Surveyors is payable to the Board. The Board shall provide each Professional Land Surveyor a form that requires the licensee to provide to the Board the physical places of business and residential addresses, report compliance with continuing education requirements, and report criminal convictions or disciplinary actions. The licensee shall give notice to the Board of a change of business or residential address within 30 days of the change. The licensee shall give notice to the Board of any criminal convictions, including DWI but not including minor traffic offenses (offenses that are not a misdemeanor or felony) of any disciplinary actions in any jurisdiction on any license, within 30 days of the conviction or disciplinary action. A nolo contendere plea is equated to a conviction for reporting purposes.

(b)  Surveyor Intern Certificate. The surveyor intern certificate does not expire and, therefore, does not have to be renewed.

(c)  "Professional Land Surveyor, Retired." The Board shall approve the application for use of the title for a person who has been duly licensed as a Professional Land Surveyor by the Board, who chooses to relinquish or not to renew a license and has had no disciplinary action that would support a determination that the licensee is not of good character and reputation.

 

History Note:        Authority G.S. 89C-17; 89C-3(9a);

Eff. February 1, 1976;

Readopted Eff. September 29, 1977;

Amended Eff. August 1, 2011; July 1, 2010; July 1, 2009; December 4, 2002; August 1, 2000; August 1, 1998; May 1, 1994;

Pursuant to G.S. 150B-21.3A, rule is necessary without substantive public interest Eff. April 27, 2019.

 

21 NCAC 56 .0607             waiver for licensees serving on active duty in the armed forces of the us

(a)  All Professional Land Surveyors currently licensed by and in good standing with the Board (whose license is not suspended or revoked) who are serving in the armed forces of the United States and who are eligible for an extension of time to file a tax return pursuant to G.S. 105-249.2 are granted a waiver of their mandatory continuing education requirements and annual renewal fee for the time period disregarded pursuant to the Internal Revenue Code 26 U.S.C. 7508.

(b)  Request for waiver by an eligible licensee, meeting requirements in Paragraph (a) of this Rule, of renewal fee and waiver of continuing education requirements:

(1)           The licensee shall notify the Board of eligibility before the current license expires. Upon such notification, the Board shall maintain the license in active status through the extension period.

(2)           If the licensee fails to notify the Board of eligibility for the extension period before the current license expires, upon receipt and acceptance of a renewal application within the extension period and presentation of proof that the licensee was eligible on the date that is the deadline for renewal, the expired license or registration shall be deemed retroactively to have not expired.

(3)           The licensee who submits a renewal application within the extension period shall not be deemed to hold a lapsed license subject to reinstatement fees.

(4)           The licensee may renew the license within the extension period despite failing to complete the specified continuing education requirements.

(5)           A licensee shall provide proof of eligibility for the extension period when the licensee or registrant submits the renewal application.

 

History Note:        Authority G.S. 89C-10; 89C-17; 93B-15;

Eff. August 1, 2011;

Pursuant to G.S. 150B-21.3A, rule is necessary without substantive public interest Eff. April 27, 2019.

 

21 NCAC 56 .0608             SURVEYOR INTERN

(a)  General. To obtain the optional certification as a Surveyor Intern, an applicant shall:

(1)           pass the fundamentals of land surveying examination and make application to the Board on a form prescribed and furnished by the Board,

(2)           be of good character and reputation,

(3)           submit three character references to the Board, one of whom is a professional land surveyor,

(4)           comply with the requirements of this rule, and

(5)           satisfy one of the following requirements related to education and experience:

(A)          Have a bachelor of science degree in surveying or other equivalent curricula, approved by the Board and a record satisfactory to the Board of one year of progressive practical experience under a practicing professional land surveyor.

(B)          Have an associate degree in surveying technology approved by the Board and a record satisfactory to the Board of two years of progressive practical experience under a practicing professional land surveyor.

(C)          Have graduated from high school or completed a high school equivalency certificate and a record satisfactory to the Board of five years of progressive practical experience, under a practicing professional land surveyor.

(D)          Graduation from a high school or the completion of a high school equivalency certificate, completion of a Land Surveyor Apprenticeship, and a record satisfactory to the Board of three years of progressive practical experience under a practicing professional land surveyor.

(b)  Request. The application form may be requested from the Board office or obtained from the website.

(c)  Application Form. Surveyor Intern Certificate Application form. After passing the Fundamentals of Land Surveying examination an applicant may make application to the Board to become certified as a "Surveyor Intern." This form requires the applicant to set forth personal history, educational background, surveying experience, character references and exhibit. A passport-type photographic quality portrait that is adequate for current identification purposes is required.

(d)  Reference Forms:

(1)           Persons applying to be certified as a Surveyor Intern shall submit to the Board names of individuals who are familiar with the applicant's work, character and reputation. The names shall be submitted by the applicant on the application form.

(2)           Persons applying for certification as a Surveyor Intern must submit three references, one of whom shall be a professional land surveyor.

(3)           In addition to the applicant submitting names to the Board of such individuals, those individuals in submitting to the Board their evaluations of the applicant shall use the reference forms supplied them by the applicant.

(4)           The reference form requires the individual evaluating the applicant to state the evaluating individual's profession, knowledge of the applicant, and information concerning the applicant's land surveying experience, character, and reputation.

(5)           The Board shall provide the reference forms to the applicant along with the application for licensure. The reference forms shall then be distributed by the applicant to the persons listed on the application as references. The applicant is responsible to have the individuals listed as references return the forms to the Board prior to the filing deadline for the examination applied for by the applicant.

(e)  Personal Interview. During the application process, the applicant may be interviewed by Board members if the members have questions regarding the applicant's education, experience or character, based upon the information submitted in the application.

 

History Note:        Authority G.S. 89C-2; 89C-10; 89C-13; 89C-14; 89C-15;

Temporary Adoption Eff. July 1, 2022;

Eff. March 1, 2023.

 

section .0700 – rules of professional conduct

 

21 NCAC 56 .0701             RULES OF PROFESSIONAL CONDUCT

(a)  In order to safeguard the life, health, property and welfare of the public and to establish and maintain a high standard of integrity, skills, and practice in the professions of engineering and land surveying, the Rules of Professional Conduct in this Rule are adopted in accordance with G.S. 89C-20 and are binding upon every person holding a certificate of licensure as a Professional Engineer or Professional Land Surveyor (licensee), and on all business entities authorized to offer or perform engineering or land surveying services in this state. All persons licensed under the provisions of Chapter 89C of the General Statutes are charged with having knowledge of the Board Rules, including the Rules of Professional Conduct, and are deemed to be familiar with their provisions and to understand them.

(b)  A licensee shall conduct the practice in order to protect the public health, safety and welfare. The licensee shall at all times recognize the primary obligation to protect the public in the performance of the professional duties. If the licensee's engineering or land surveying judgment is overruled under circumstances where the safety, health and welfare of the public are endangered, the licensee shall inform the employer, the client, the contractor, other affected parties and any appropriate regulatory agency of the possible consequences of the situation.

(c)  A licensee shall perform services only in areas of the licensee's competence and:

(1)           Shall undertake to perform engineering and land surveying assignments only when qualified by education or experience in the specific technical field of professional engineering or land surveying involved;

(2)           May accept an assignment or project requiring education or experience outside of the licensee's own field of competence, but only to the extent that the services are restricted to those portions or disciplines of the project in which the licensee is qualified. All other portions or disciplines of such project shall be performed by associates, consultants, or employees who are licensed and competent in those portions or disciplines;

(3)           Shall not affix the signature or seal to any engineering or land surveying plan or document dealing with subject matter for which the licensee lacks competence by virtue of education or experience, nor to any such plan or document not prepared under the licensee's direct supervisory control. Direct supervisory control (responsible charge) requires a licensee or employee to carry out all client contacts, provide internal and external financial control, oversee employee training, and exercise control and supervision over all job requirements to include research, planning, design, field supervision and work product review. Direct supervisory control may be accomplished face to face or by other means of communication. A licensee shall not contract with a non-licensed individual to provide these professional services. Research, such as title searches and soil testing, may be contracted to a non-licensed individual, provided that individual is qualified or licensed to provide such service and provided the licensee reviews the work. The licensee may affix the seal and signature to drawings and documents depicting the work of two or more professionals provided it is designated by a note under the seal the specific subject matter for which each is responsible; and

(4)           In circumstances where a licensee in responsible charge of the work is unavailable to complete the work, or the work is a design plan signed and sealed by an out-of-jurisdiction licensee (not a site adaptation of a standard design plan under Rule 21 NCAC 56 .1106) a successor licensee may take responsible charge by performing and documenting all professional services to include developing a design file including work or design criteria, calculations, code research, and any necessary and appropriate changes to the work. The non-professional services, such as drafting, need not be redone by the successor licensee but must distinguish in a clean and obvious manner and accurately reflect the successor licensee's work. The burden is on the successor licensee to show such compliance. The successor licensee shall have control of and responsibility for the work product and the signed and sealed originals of all documents.

(d)  A licensee shall issue public statements only in an objective and truthful manner and:

(1)           Shall be objective and truthful in all professional reports, statements or testimony. The licensee shall include all relevant and pertinent information in such reports, statements or testimony;

(2)           When serving as an expert or technical witness before any court, commission, or other tribunal, shall express an opinion only when it is founded upon adequate knowledge of the facts in issue, upon a background of technical competence in the subject matter, and upon honest conviction of the accuracy and propriety of the licensee's testimony;

(3)           Shall issue no statements, criticisms, or arguments on engineering or land surveying matters connected with public policy which are inspired or paid for by an interested party, or parties, unless the licensee has prefaced the comment by explicitly identifying the licensee's name, by disclosing the identities of the party or parties on whose behalf the licensee is speaking, and by revealing the existence of any pecuniary interest the licensee may have in the matters; and

(4)           Shall not attempt to injure, maliciously or falsely, directly or indirectly, the professional reputation, prospects, practice or employment of another engineer or land surveyor, nor indiscriminately criticize another engineer or land surveyor's work in public. Indiscriminate criticism includes statements without valid basis or cause or that are not objective and truthful or that fail to include all relevant and pertinent information. If the licensee believes that another engineer or land surveyor is guilty of misconduct or illegal practice, such information shall be presented to the North Carolina Board of Examiners in the form of a complaint.

(e)  A licensee shall avoid conflicts of interest and:

(1)           Shall inform the employer or client, and any reviewing agency, of any business association, interests, or circumstances which could influence judgment or the quality of services;

(2)           Shall not accept compensation, financial or otherwise, from more than one party for services on the same project, or for services pertaining to the same project, unless the circumstances are disclosed to, and agreed to, in writing, by all interested parties;

(3)           Shall not solicit or accept financial or other valuable considerations from material or equipment suppliers for specifying their products;

(4)           Shall not solicit or accept gratuities, directly or indirectly, from contractors, their agents, or other parties dealing with the client or employer in connection with work for which the licensee is responsible;

(5)           When in public service as a member, advisor, or employee of a governmental body or department, shall not participate in considerations or actions with respect to services provided by the licensee or the licensee's firm in private engineering and land surveying practices;

(6)           Shall not solicit or accept an engineering or land surveying contract from a governmental body on which a principal or officer of the licensee's firm serves as a member; and

(7)           Shall not attempt to supplant another engineer or land surveyor in a particular employment after becoming aware that the other has been selected for the employment.

(f)  A licensee shall solicit or accept work only on the basis of qualifications and:

(1)           Shall not offer to pay, either directly or indirectly, any commission, political contribution, gift, or other consideration in order to secure work, exclusive of securing salaried positions through employment agencies;

(2)           Shall compete for employment on the basis of professional qualification and competence to perform the work. The licensee shall not solicit or submit proposals for professional services containing a false, fraudulent, misleading, deceptive or unfair statement or claim regarding the cost, quality or extent of services to be rendered;

(3)           Shall, with regard to fee bidding on public projects, comply with the provisions of G.S. 143-64.31 et seq., (or for federal projects, the Brooks Act, 40 U.S. Code 541 et seq.) and shall not knowingly cooperate in a violation of any provision of G.S. 143-64.31 et seq. (or of 40 U.S. Code 541 et seq.); and

(4)           Shall not falsify or permit misrepresentation of academic or professional qualifications and shall only report educational qualifications when a degree or certificate was awarded, unless it is stated that no degree or certificate was awarded. The licensee shall not misrepresent degree of responsibility in or for the subject matter of prior assignments. Brochures or other presentations incident to the solicitation of employment shall not misrepresent pertinent facts concerning employers, employees, associates, joint ventures, or past accomplishments with the intent and purpose of enhancing qualifications and work.

(g)  A licensee shall perform services in an ethical manner, as required by the Rules of Professional Conduct (21 NCAC 56 .0701), and in a lawful manner and:

(1)           Shall not knowingly associate with or permit the use of the licensee's name or firm name in a business venture by any person or firm which the licensee knows, or has reason to believe, is engaging in business or professional practices of a fraudulent or dishonest nature or is not properly licensed; and

(2)           If the licensee has knowledge or reason to believe that another person or firm may be in violation of the Board Rules (21 NCAC 56) or of the North Carolina Engineering and Land Surveying Act (G.S. 89C), shall present such information to the Board in writing in the form of a complaint and shall cooperate with the Board in furnishing such further information or assistance as may be required by the Board. The licensee shall timely respond to all inquiries and correspondence from the Board and shall timely claim correspondence from the U. S. Postal Service, or other delivery service, sent to the licensee from the Board. Timely is defined as within the time specified in the correspondence, or if no time is specified, within 30 days of receipt. Certified mail is timely claimed if prior to being returned by the Post Office to the Board office.

(h)  A Professional Engineer or Professional Land Surveyor who has received a reprimand or civil penalty or whose professional license is revoked, suspended, denied, refused renewal, refused reinstatement, put on probation, restricted, or surrendered as a result of disciplinary action by another jurisdiction is subject to discipline by the Board if the licensee's action constitutes a violation of G.S. 89C or the rules adopted by the Board.

 

History Note:        Authority G.S. 89C-17; 89C-20;

Eff. February 1, 1976;

Readopted Eff. September 29, 1977;

Amended Eff. September 1, 2011; May 1, 2009; August 1, 2002; August 1, 2000; August 1, 1998; November 2, 1992; April 1, 1989; January 1, 1982; March 1, 1979;

Pursuant to G.S. 150B-21.3A, rule is necessary without substantive public interest Eff. April 27, 2019.

 

21 NCAC 56 .0702             RULES OF CONDUCT OF ADVERTISING

(a)  The Professional Engineer or Professional Land Surveyor shall not make exaggerated, misleading, deceptive or false statements or claims about professional qualifications, experience or performance in brochures, correspondence, listings, or other public communications.

(b)  The prohibitions listed in Paragraph (a) of this Rule include, but are not limited to, the use of statements containing a material misrepresentation of fact or omitting a material fact necessary to keep the statement from being misleading; statements intended or likely to create an unjustified expectation; and statements containing a prediction of future success.

(c)  Consistent with the foregoing, the Professional Engineer or Professional Land Surveyor may advertise for recruitment of personnel.

(d)  Consistent with the foregoing, the Professional Engineer or Professional Land Surveyor may prepare articles for the lay or technical press. Such articles shall not imply credit to the author for work performed by others.

 

History Note:        Authority G.S. 89C‑20;

Eff. February 1, 1976;

Readopted Eff. September 29, 1977;

Amended Eff. August 1, 2000; August 1, 1998; April 1, 1989; March 1, 1979;

Pursuant to G.S. 150B-21.3A, rule is necessary without substantive public interest Eff. April 27, 2019.

 

SECTION .0800 ‑ FIRM REGISTRATION

 

21 NCAC 56 .0801             REQUIREMENTS

 

History Note:        Authority G.S. 55B-10; 89C‑24;

Eff. February 1, 1976;

Readopted Eff. September 29, 1977;

Amended Eff. January 1, 1982;

Repealed Eff. April 1, 1989.

 

21 NCAC 56 .0802             PROCEDURE

(a)  Professional Corporations and Limited Liability Companies:

(1)           Request. A request for an application for licensure as a professional corporation or professional limited liability company engaged in the practice of engineering or land surveying may be made at the Board office at 4601 Six Forks Road, Suite 310, Raleigh, NC 27609 or obtained from the website at www.ncbels.org.

(2)           Applicable Form. All professional corporations and professional limited liability companies complying with the statutory requirements of G.S. 89C, G.S. 55B and G.S. 57D that desire to practice engineering or land surveying shall apply by using a form prepared by the Board. This form shall require the applicant, by and through an officer, director and shareholder of the professional corporation or limited liability company who is licensed with the North Carolina Board of Examiners for Engineers and Surveyors in a profession of the services to be offered, to certify that it and the stockholders of the corporation or members of the limited liability company have complied with the provisions of the applicable provisions of the General Statutes. The form shall also require that the officers, directors, shareholders, members and professional employees be listed on that application.

(3)           Certificate of Licensure:

(A)          Upon receiving the application with application fee of one hundred dollars ($100.00), the Board, after determining that the firm has complied with the statutory requirements, shall issue a certificate of compliance.

(B)          The firm shall forward the certificate of compliance to the Secretary of State along with its articles of incorporation or articles of organization.

(C)          Upon approval by the Secretary of State, the firm shall forward to the Board a certified copy of its articles of incorporation or articles of organization.

(D)          Upon receipt of the certified copy of the articles of the firm, if all statutory requirements have been met, the Board shall approve the application and issue the firm a certificate of licensure.

(b)  Business Firms and Chapter 87 Corporations:

(1)           Request. A request for an application for licensure as a business firm or Chapter 87 corporation, as defined in G.S. 55B-15(a)(2), engaged in the practice of engineering or land surveying may be made at the Board office or obtained from the website. A sole proprietorship owned and operated by the individual licensee in the licensee's name as reflected in the Board's records is exempt from firm licensure.

(2)           Applicable Form. All business firms or Chapter 87 corporations that desire to practice engineering or land surveying shall apply by using a form prepared by the Board. The form shall require the applicant, through a principal officer, partner or owner, to certify that the business firm will be operated in compliance with the laws of the State of North Carolina and the rules of the North Carolina Board of Examiners for Engineers and Surveyors.

(3)           Certificate of Licensure. Upon receiving the application with application fee of one hundred dollars ($100.00), the Board, after determining that the firm has complied with the statutory requirements, shall issue a certificate of licensure.

 

History Note:        Authority G.S. 55B-4; 55B-10; 55B-15; 57D-2-02; 89C-10; 89C-24;

Eff. February 1, 1976;

Readopted Eff. September 29, 1977;

Amended Eff. August 1, 2014; May 1, 2009; August 1, 2000; February 1, 1996; May 1, 1994; April 1, 1989; January 1, 1982;

Pursuant to G.S. 150B-21.3A, rule is necessary without substantive public interest Eff. April 27, 2019.

 

21 NCAC 56 .0803             FEES

 

History Note:        Authority G.S. 89C‑10; 89C‑24;

Eff. February 1, 1976;        Readopted Eff. September 29, 1977;

Repealed Eff. April 1, 1989.

 

21 NCAC 56 .0804             ANNUAL RENEWAL AND 30-DAY REPORTING OF VIOLATIONS AND CHANGE OF ADDRESS

(a)  Renewal. The certificate of licensure for a business shall be renewed annually.

(b)  Expiration. The certificate of licensure expires on the last day of June following its issuance by the Board and becomes invalid on that date unless renewed.

(c)  Written Application. The applicant shall submit a written application on a renewal form provided by the Board that requires the physical place of business address and report of disciplinary actions, accompanied by a fee of seventy-five dollars ($75.00). The Board shall renew the certificate of licensure, providing that the business has complied with all rules of the Board and applicable General Statutes of North Carolina. The form shall be provided to all licensees in good standing no later than June 1st.

(d)  Reporting. The business shall give notice to the Board on a change form within 30 days of any change of:

(1)           business address and branch locations;

(2)           resident professional or licensee in responsible charge;

(3)           business name;

(4)           officers, directors, or owners; or

(5)           the services being offered.

The business shall give notice to the Board of any disciplinary actions or conviction of any crime, in any jurisdiction on any license within 30 days of the disciplinary action or conviction.

(e)  If a business fails to renew its certificate of licensure within one year of the expiration date, the business shall submit a new application for a new certificate of licensure in accordance with all requirements of 21 NCAC 56 .0802.

(f)  If any business that holds a current certificate of licensure ceases business because the professional licensee receives a waiver from paying the individual renewal fee under 21 NCAC 56 .0506 or 21 NCAC 56 .0607, the annual renewal fee for the business shall be waived for the same time period.

 

History Note:        Authority G.S. 55B-11; 57D-2-01; 89C-10; 89C-14; 89C-17; 89C-24;

Eff. February 1, 1976;

Readopted Eff. September 29, 1977;

Amended Eff. August 1, 2011; July 1, 2010; July 1, 2009; December 4, 2002; April 1, 2001; February 1, 1996; May 1, 1994;

Pursuant to G.S. 150B-21.3A, rule is necessary without substantive public interest Eff. April 27, 2019;

Amended Eff. July 1, 2020.

 

21 NCAC 56 .0805             REGISTRATION NOT REQUIRED

 

History Note:        Authority G.S. 55b-15; 89C‑10; 89C‑24;

Eff. February 1, 1976;

Readopted Eff. September 29, 1977;

Repealed Eff. April 1, 1989.

 

SECTION .0900 ‑ BUSINESS entities: GENERAL

 

21 NCAC 56 .0901             OFFICES

(a)  Professional Engineering Services. Every firm, partnership, corporation or limited liability company that performs or offers to perform engineering services in the State of North Carolina shall have a resident Professional Engineer in responsible charge in each separate office located in North Carolina where professional engineering services are performed or offered to be performed. Out-of-state office locations where engineering services are performed or offered to be performed for North Carolina projects shall have Professional Engineers in responsible charge of only the specific projects in compliance with Rule .0701(c)(3) of this Chapter.

(b)  Land Surveying Services. Every firm, partnership, corporation or limited liability company that performs or offers to perform land surveying services in the State of North Carolina shall have a resident Professional Land Surveyor in responsible charge in each separate office located in North Carolina where land surveying services are performed or offered to be performed. Out-of-state office locations where surveying services are performed or offered to be performed for North Carolina projects are only required to have Professional Land Surveyors in responsible charge of the specific projects in compliance with Rule .0701(c)(3) of this Chapter.

(c)  Resident. The terms "resident Professional Engineer" or "resident Professional Land Surveyor" as used in this Rule, means a licensee who spends a majority of the licensee's normal working time in that office. Such time shall not be less than a majority of the operating hours of the business. A Professional Engineer or Professional Land Surveyor shall be the resident licensee at only one place of business at one time unless each business is at least one-third owned by the resident professional. This arrangement shall be specifically approved by the Board after a determination that the businesses are integrated in operation, ownership, office location and that the licensee will be in responsible charge of the professional services.

(d)  No firm, partnership, corporation or limited liability company shall practice, offer to practice, or market either land surveying or engineering unless there is a licensed resident for that service in responsible charge at that office. Advertisements, signs, letterheads, business cards, directories, or any other form of representation shall avoid any reference to any service that cannot be provided under the responsible charge of a properly qualified resident professional. The licensed entity shall give notice to the Board of a change of resident professional within 30 days after the change and shall not practice, offer to practice, or market the professional service during any period of time without a resident professional.

 

History Note:        Authority G.S. 57D-2-02: 89C‑10; 89C‑24;

Eff. February 1, 1976;

Readopted Eff. September 29, 1977;

Amended Eff. August 1, 2014; August 1, 2002; April 1, 2001; August 1, 1998; May 1, 1994; January 1, 1992; April 1, 1989;

Pursuant to G.S. 150B-21.3A, rule is necessary without substantive public interest Eff. April 27, 2019.

 

21 NCAC 56 .0902             business TITLES

(a)  Companies, partnerships, corporations, limited liability companies, or any other business providing professional engineering or land surveying services in North Carolina shall not practice under a name that is misleading. Except as provided in Paragraph (b), for purposes of this Rule, "misleading" means that the titles of engineering or land surveying companies, partnerships, corporations, limited liability companies, or any other business organized for the primary purpose of providing such professional services shall not contain the name of an individual:

(1)           who is not licensed to provide the professional services offered in North Carolina;

(2)           who is not eligible for licensure by comity to provide the professional services offered in North Carolina under the provisions of G.S. 89C-13; or

(3)           who is licensed to provide the professional services, offered in North Carolina, in a state where the business (or of a successor to that business or business created to comply with G.S. 55B), is incorporated, organized, or is authorized to transact business.

(b)  A business may include in its title the name or names of one or more deceased or retired former members of the business, or of a successor to that business or a business created to comply with G.S. 55B, provided that the business submits a letter of request and explanation with its application to the Board, and that the Board finds that the use of the name is not misleading.

(c)  A business shall not change its title, or operate under an assumed name, without first applying to the Board for a determination that the proposed title meets the requirements of Paragraph (a) or (b) of this Rule. Requests for name changes shall be made in writing on the change forms referenced in 21 NCAC 56 .0804(d). Requests to operate under an assumed name shall be made in writing.

 

History Note:        Authority G.S. 55B‑5; 57D-2.01; 89C‑10; 89C‑24;

Eff. February 1, 1976;

Readopted Eff. September 29, 1977;

Amended Eff. August 1, 2000; August 1, 1998; May 1, 1994; April 1, 1989; April 1, 1980;

Pursuant to G.S. 150B-21.3A, rule is necessary without substantive public interest Eff. April 27, 2019;

Amended Eff. July 1, 2020.

 

SECTION .1000 ‑ TEMPORARY PERMIT

 

21 NCAC 56 .1001             GENERAL

21 NCAC 56 .1002             APPLICATION PROCEDURE

21 NCAC 56 .1003             SEAL

 

History Note:        Authority G.S. 89C-10; 89C‑25;

Eff. February 1, 1976;

Readopted Eff. September 29, 1977;

Amended Eff. August 1, 2000; April 1, 1989; January 1, 1982;

Repealed Eff. February 1, 2013.

 

SECTION .1100 ‑ SEAL

 

21 NCAC 56 .1101             GENERAL

It is misconduct for a Professional Engineer or Professional Land Surveyor to seal work done by another individual unless the work is performed under the "responsible charge" of the Professional Engineer or Professional Land Surveyor.

 

History Note:        Authority G.S. 89C‑3(10); 89C‑10; 89C‑16;

Eff. February 1, 1976;

Readopted Eff. September 29, 1977;

Amended Eff. August 1, 2000; April 1, 1989; December 1, 1984; January 1, 1982;

Pursuant to G.S. 150B-21.3A, rule is necessary without substantive public interest Eff. April 27, 2019.

 

21 NCAC 56 .1102             DESIGN

The standard design of the seal shall be two concentric circles in which North Carolina and the name of the licensee are placed within the outermost circle and in which the license number of the licensee and either "Professional Engineer" or "Professional Land Surveyor," is placed within the innermost circle. The size shall be 1 ½ to 1 ¾ inches in diameter.

 

History Note:        Authority G.S. 89C-10; 89C-16;

Eff. February 1, 1976;

Readopted Eff. September 29, 1977;

Amended Eff. May 1, 2009; August 1, 2000; August 1, 1998; April 1, 1989; January 1, 1982;

Pursuant to G.S. 150B-21.3A, rule is necessary without substantive public interest Eff. April 27, 2019.

 

21 NCAC 56 .1103             STANDARD CERTIFICATION REQUIREMENTS

(a)  Certification of Final Drawings. Drawings or maps not subject to the exceptions in Paragraph (c) of this Rule shall conform to the following:

(1)           Certification is required on reproducibles or original drawings;

(2)           The seal may be a rubber stamp, embossed seal, computer-generated seal, or other facsimile that becomes a permanent addition to a plan sheet or map;

(3)           The licensee's written signature must be placed over, or adjacent to, the seal on the original document. A facsimile signature is not acceptable;

(4)           The date of signing must be annotated on the original document;

(5)           All sheets of engineering and surveying drawings must be certified;

(6)           The name, address and license number of the licensee's firm shall be included on each sheet of engineering drawings. For surveys, the name, address and license number of the licensee's firm shall be included on the first sheet of the survey or title sheet. The individual license number of the sole proprietor shall be used as the license number for an exempt sole proprietorship that meets the requirements of 21 NCAC 56 .0802(b)(1); and

(7)           Any revision on a drawing after a licensee's certification is affixed shall be described and dated and if not done under the responsible charge of the same licensee shall be separately certified.

(b)  Certification of Specifications and Reports. All specifications, reports, or other documents, including letter reports and calculations, not subject to the exceptions in Paragraph (c) of this Rule shall conform to the following:

(1)           Certification is required on original specifications, reports, or other documents, including letter reports and calculations;

(2)           The seal may be a rubber stamp, or other facsimile;

(3)           The licensee's written signature must be placed over, or adjacent to, the seal on the original document. A facsimile signature is not acceptable;

(4)           The date of signing must be annotated on the original document;

(5)           The title sheet of engineering specifications or other reports must be certified and bear the name, address and license number of the licensee's firm. The title sheet of any survey report or written description of property shall include the name, address and license number of the licensee's firm. The individual license number of a sole proprietor shall be used as the license number for an exempt sole proprietorship that meets the requirements of 21 NCAC 56 .0802(b)(1); and

(6)           Any revision in the document after a licensee's certification is affixed shall be described and dated and if not done under the responsible charge of the same licensee shall be separately certified.

(c)  Exceptions to Required Certification. The certification of a licensee on a map, drawing, plan, specification, plat, document, or report shall signify that it is the final work of the licensee unless the work is stamped or marked substantially as follows so as to put the public on notice not to use as a final product, in which case certification is optional:

(1)           "Preliminary - Do not use for construction";

(2)           "Progress Drawings - Do not use for construction";

(3)           "Preliminary Plat - Not for recordation, conveyances, or sales";

(4)           "Final Drawing - Not released for construction";

(5)           "Final Drawing - For Review Purposes Only";

(6)           "Not a Certified Document – This document originally issued and sealed by (name of licensee), (license number), on (date of sealing). This document shall not be considered a certified document";

(7)           "Not a Certified Document as to the Original Document but Only as to the Revisions - This document originally issued and sealed by (name of licensee), (license number), on (date of sealing). This document is only certified as to the revisions".

(d)  Electronically Transmitted Documents. Documents, including drawings, specifications and reports, that are transmitted electronically beyond the direct control of the licensee shall have the computer-generated seal removed from the original file, unless signed with a digital signature as defined in Paragraph (e) of this Rule. After removal of the seal the electronic media shall have the following inserted in lieu of the signature and date: "This document originally issued and sealed by (name of sealer), (license number), on (Date of sealing). This medium shall not be considered a certified document." Hardcopy documents containing the original seal, signature and date of the licensee may be duplicated by photocopy or electronic scanning processes and distributed either in hardcopy or electronic medium. The scanned digital files of certified documents are not subject to the requirements of this Paragraph. The electronic transmission beyond the direct control of the licensee of CAD, vector or other files subject to easy editing are subject to the requirements of this paragraph. Easy editing is based on the file consisting of separate elements that can be individually modified or deleted. Documents that are excepted from certification by a statement meeting the requirements of Subparagraphs (c)(1) through (c)(5) of this Rule are not subject to the requirements of this Paragraph.

(e)  Documents to be electronically transmitted beyond the direct control of the licensee that are signed using a digital signature, shall contain the authentication procedure in a secure mode and a list of the hardware, software and parameters used to prepare the document(s). Secure mode means that the authentication procedure has protective measures to prevent alteration or overriding of the authentication procedure. The term "digital signature" shall be an electronic authentication process that is attached to or logically associated with an electronic document. The digital signature shall be:

(1)           Unique to the licensee using it;

(2)           Capable of verification;

(3)           Under the sole control of the licensee; and

(4)           Linked to a document in such a manner that the digital signature is invalidated if any data in the document is changed.

(f)  A digital signature process may be submitted to the Board for approval that it meets the criteria set forth in Subparagraphs (e)(1) through (4) of this Rule. The licensee shall confirm that if another process is used, that it meets the criteria.

 

History Note:        Authority G.S. 89C-10; 89C-16;

Eff. February 1, 1976;

Readopted Eff. September 29, 1977;

Amended Eff. August 1, 2011; July 1, 2009; May 1, 2009; August 1, 2002; August 1, 2000; August 1, 1998; February 1, 1996; May 1, 1994; April 1, 1989; December 1, 1984;

Pursuant to G.S. 150B-21.3A, rule is necessary without substantive public interest Eff. April 27, 2019.

 

21 NCAC 56 .1104             CERTIFICATION WITH TEMPORARY PERMIT

 

History Note:        Authority G.S. 89C‑10; 89C‑16; 89C‑25;

Eff. February 1, 1976;

Readopted Eff. September 29, 1977;

Amended Eff. August 1, 2000; August 1, 1998; February 1, 1996; April 1, 1989; January 1, 1982;

Repealed Eff. February 1, 2013.

 

21 NCAC 56 .1105             FIRM SEAL

The use of a seal by a firm is not required for certification. A firm seal is not authorized for use in lieu of the required seal of a Professional Engineer or Professional Land Surveyor. When a firm seal is used, it does not relieve the individual licensee of the requirements and responsibilities pertaining to the individual's seal.

 

History Note:        Authority G.S. 89C‑10; 89C‑16; 89C‑25;

Eff. February 1, 1976;

Readopted Eff. September 29, 1977;

Amended Eff. August 1, 2000; August 1, 1998; May 1, 1994; January 1, 1982;

Pursuant to G.S. 150B-21.3A, rule is necessary without substantive public interest Eff. April 27, 2019.

 

21 NCAC 56 .1106             CERTIFICATION OF STANDARD DESIGN PLANS

Standard design plans that were initially prepared and certified by an individual who is a licensed engineer in the state of origin of such plans (including North Carolina) may then be reviewed by a North Carolina Professional Engineer for code conformance, design adequacy, and site adaptation for the specific application within North Carolina. The reviewing Professional Engineer who is licensed in North Carolina assumes responsibility for such standard designs. Standard plans, which bear the seal of the original design engineer who is a licensed engineer in another state, or North Carolina, shall be sealed by the reviewing North Carolina Professional Engineer who is assuming responsibility. In addition to the seal, a statement shall be included as follows: "These plans have been properly examined by the undersigned. I have determined that they comply with existing local North Carolina codes, and have been properly site adapted for use in this area."

 

History Note:        Authority G.S. 89C‑10; 89C‑16;

Eff. February 1, 1976;

Readopted Eff. September 29, 1977;

Amended Eff. May 1, 2009; August 1, 2000; August 1, 1998; April 1, 1989; December 1, 1984; January 1, 1982;

Pursuant to G.S. 150B-21.3A, rule is necessary without substantive public interest Eff. April 27, 2019.

 

21 NCAC 56 .1107             CERTIFICATION OF PLANS FOR BUILDING AND STRUCTURE PERMITS

21 NCAC 56 .1108             LAND SURVEYING

 

History Note:        Authority G.S. 89C‑10; 89C‑16; 89C‑21;

Eff. January 1, 1982;

Amended Eff. December 1, 1984;

Repealed Eff. April 1, 1989.

 

SECTION .1200 ‑ RULEMAKING PROCEDURES

 

21 NCAC 56 .1201             PETITIONS

(a)  Any person wishing to submit a petition requesting the adoption, amendment or repeal of a rule by the Board shall send the petition to the executive director at the Board's office in Raleigh, North Carolina.

(b)  The petition shall contain the following information:

(1)           a draft of the proposed rule;

(2)           reason for proposal;

(3)           effect on existing rules;

(4)           any data supporting proposal;

(5)           effect of the proposed rule on existing practices in the area involved, including cost factors;

(6)           names of those most likely to be affected by the proposed rule, with addresses if reasonably known; and

(7)           name and address of each petitioner.

(c)  A review committee made up of one member of the Board, the executive director and the legal counsel for the Board, on behalf of the Board, shall determine, based on a study of the facts stated in the petition, whether the public interest will be served by granting it. It shall consider all the contents of the submitted petition, plus any additional information it deems relevant.

(d)  The executive director, on behalf of the review committee, shall make a recommendation to the Board for the denial of the petition or the institution of rulemaking proceedings, as the case may be.

(e)  Within 120 days of submission of the petition, the Board shall render a final decision.

(f)  If the decision is to deny the petition, the executive director, on behalf of the Board, will notify the petitioner in writing, stating the reasons therefore. If the decision is to grant the petition, the Board shall publish notice of rulemaking proceedings.

 

History Note:        Authority G.S. 89C‑10; 150B‑20;

Eff. February 1, 1976;

Readopted Eff. September 29, 1977;

Amended Eff. August 1, 2000; August 1, 1998; April 1, 1989; January 1, 1982;

Pursuant to G.S. 150B-21.3A, rule is necessary without substantive public interest Eff. April 27, 2019.

 

21 NCAC 56 .1202             NOTICE

 

History Note:        Authority G.S. 89C‑10; 150A‑12(c); 150A‑12;

Eff. February 1, 1976;

Readopted Eff. September 29, 1977;

Amended Eff. December 1, 1984;

Repealed Eff. April 1, 1989.

 

21 NCAC 56 .1203             HEARINGS

(a)  Unless otherwise stated in a particular rulemaking notice, hearings before the Board shall be held in the Board office.

(b)  Presentations may not exceed 10 minutes unless, upon request, either before or at the hearing, the Board grants an extension of time, for a fuller explanation.

(c)  Upon receipt of a request to make an oral presentation the executive director shall acknowledge receipt of the request, and inform the person making the request of the imposition of any limitations deemed necessary to the end of a full and effective public hearing on the proposed rule.

(d)  Any person may file a written submission containing data, comments or arguments after publication of a rulemaking notice as allowed by G.S. 150B-21.2(f). Written submissions, except when otherwise stated in the particular rulemaking notice, shall be sent to the Board. Such submissions shall clearly state the proposed rule(s) to which the comments are addressed.

(e)  Upon receipt of such written comments, prompt acknowledgment shall be made by the Board.

(f)  The presiding officer at the hearing shall have complete control of the proceedings, including extensions of any time requirements, recognition of speakers, time allotments for presentations, direction of the flow of the discussion and the management of the hearing. The presiding officer, at all times, shall take care that each person participating in the hearing is given a fair opportunity to present views, data and comments.

(g)  A record of all rulemaking proceedings shall be maintained at the Board's office.

 

History Note:        Authority G.S. 89C‑10; 150B‑21.2;

Eff. February 1, 1976;

Readopted Eff. September 29, 1977;

Amended Eff. August 1, 2000; August 1, 1998; April 1, 1989; January 1, 1982;

Pursuant to G.S. 150B-21.3A, rule is necessary without substantive public interest Eff. April 27, 2019.

 

21 NCAC 56 .1204             EMERGENCY RULES

 

History Note:        Authority G.S. 89C‑10; 150A‑13;

Eff. February 1, 1976;

Readopted Eff. September 29, 1977;

Repealed Eff. April 1, 1989.

 

21 NCAC 56 .1205             DECLARATORY RULINGS

(a)  Any person substantially affected by a statute administered or rule promulgated by the Board may request a declaratory ruling as to whether or how the statute or rule applies to a given factual situation or whether a particular agency rule is valid.

(b)  All requests for declaratory rulings shall be written and mailed to the Board.

(c)  All requests for a declaratory ruling must include the following information:

(1)           name and address of petitioner;

(2)           statute or rule to which petition relates;

(3)           concise statement of the manner in which petitioner is aggrieved by the rule or statute or its potential application to petitioner;

(4)           a statement of whether an oral hearing is desired, and if so, the reasons for such an oral hearing.

(d)  Whenever the Board believes for good cause that the issuance of a declaratory ruling is undesirable, it may refuse to do so. When good cause is deemed to exist, the Board shall notify the petitioner of its decision in writing stating reasons for the denial of a declaratory ruling.

(e)  Where a declaratory ruling is deemed appropriate, the Board shall issue the ruling within 60 days of receipt of the petition.

(f)  A declaratory ruling procedure may consist of written submissions, oral hearings, or such other procedure as may be appropriate in a particular case.

 

History Note:        Authority G.S. 89C‑10; 150B‑4;

Eff. February 1, 1976;

Readopted Eff. September 29, 1977;

Amended Eff. August 1, 1998;

Pursuant to G.S. 150B-21.3A, rule is necessary without substantive public interest Eff. April 27, 2019.

 

section .1300 – board disciplinary procedures

 

21 NCAC 56 .1301             IMPROPER PRACTICE BY A LICENSEE

(a)  General. Licensee practice that may violate the rules of this Chapter or G.S. 89C is subject to Board investigation and disciplinary action by the Board.

(b)  Preferring Charges. Any person who believes that any licensed Professional Engineer, Professional Land Surveyor, or business holding a certificate of licensure is in violation of the provisions of G.S. 89C or the rules in this Chapter may prefer charges against that person or business, in the form of a complaint, completed to the best of that individual's knowledge and belief, along with providing corroborative evidence that helps support the charges. An optional complaint form is provided by the Board to aid in filing the complaint.

(c)  Preliminary Review:

(1)           Upon receipt of a filed charge that meets requirements of G.S. 89C and the rules of the Board a case shall be opened. Other information indicating that a licensee is in violation of the provisions of G.S. 89C or the rules of the Board may be a basis for opening a case by the Board.

(2)           A field investigation may be performed if determined necessary by the Executive Director in order to obtain additional information and evidence.

(3)           If the Executive Director determines that the charges are corroborated by evidence, a written notice and explanation of the charge shall be forwarded to the person or business against whom the charge is made and a response requested, within 15 days, to show compliance with G.S. 89C and the rules of the Board for retention of the license. Notice of the charge and of the alleged facts or alleged conduct shall be given personally or by certified mail, return receipt request.

(4)           After preliminary evidence has been obtained, the matter shall be referred to the Board's review committee, made up of the following individuals:

(A)          one member of the Board who is licensed in the respective profession;

(B)          the legal counsel of the Board; and

(C)          the Executive Director of the Board or Assistant Executive Director if designated by the Executive Director.

(5)           Upon review of the evidence, the review committee shall:

(A)          recommend that the Board dismiss the charge as unfounded or trivial;

(B)          when the charge is admitted as true, recommend that the Board accept the admission of guilt by the person charged and order that person not to commit in the future the specific act or acts admitted and also not to violate any of the provisions of the Board rules or the statutes at any time in the future;

(C)          present the charge, whether admitted or denied, to the full Board for a hearing and determination by the Board on the merits of the charge in accordance with the substantive and procedural requirements of the provisions of Section .1400 of this Chapter and the provisions of G.S. 150B; or

(D)          whether the charge is admitted or denied, give written notice to the licensee that:

(i)            sufficient evidence exists which, if not rebutted or explained, would justify the Board in taking an action set out in Rule .1402(4) through (12) of this Chapter;

(ii)           stating the nature of the evidence; and

(iii)          that unless the licensee, within 20 days after service of said notice, deposits in the mail a certified letter addressed to the Board and containing a request for a hearing or settlement conference, that it will recommend that the Board take the action(s) specified in the notice, set out in Rule .1402(4) through (12) of this Chapter.

(d)  Consultant. A consultant to the review committee shall be designated by the Board Chair if a board member is a complainant, witness, or respondent in a case. The consultant shall be a licensed professional engineer or professional land surveyor, depending on the nature of the case. The consultant shall review all case materials and make a recommendation for consideration by the review committee as to the merits of the case. The consultant shall review any new information presented in the event of a settlement conference and make a recommendation to the settlement conference committee.

(e)  Board Decision. When the review committee proceeds pursuant to Parts (c)(5)(A) or (B) of this Rule, upon approval of the Board, notice shall be given to the party against whom the charges have been brought and the party submitting the charge. The Board is not required to notify the parties of the reasons of the Board in making its decision.

(f)  Settlement Conference. When the review committee proceeds pursuant to Parts (c)(5)(C) or (D) of this Rule, the licensee may request in writing a settlement conference to pursue resolution of the issue(s) through informal procedures. If, after the completion of a settlement conference, the licensee and Board's settlement committee do not agree to a resolution of the dispute for the full Board's consideration, the original administrative proceeding shall commence. During the course of the settlement conference, no sworn testimony shall be taken, nor shall any witnesses be cross-examined.

(1)           The Board's settlement committee shall be made up of the following individuals:

(A)          the member of the Board who served on the review committee or a replacement member if the member is not available;

(B)          one public member from the Board;

(C)          the legal counsel of the Board; and

(D)          the Executive Director of the Board or Assistant Executive Director if designated by the Executive Director.

(2)           Upon review of the evidence, the settlement committee shall:

(A)          recommend that the Board dismiss the charge as unfounded or trivial;

(B)          when the charge is admitted as true, recommend the Board accept the admission of guilt by the person charged and order the person not to commit in the future the specific act or acts admitted and, also, not to violate any provisions of the Board Rules or the statutes at any time in the future;

(C)          direct that the charge, whether admitted or denied, be presented to the full Board for a hearing and determination by the Board on the merits of the charge in accordance with the substantive and procedural requirements of the provisions of Section .1400 of this Chapter and the provisions of G.S. 150B; or

(D)          recommend that the Board approve a settlement agreed to by the licensee and proposed by the settlement conference committee.

 

History Note:        Authority G.S. 89C‑10; 89C‑21; 89C‑22;

Eff. February 1, 1976;

Readopted Eff. September 29, 1977;

Amended Eff. August 1, 2011; July 1, 2009; May 1, 2009; August 1, 2000; August 1, 1998; March 1, 1996; April 1, 1989; December 1, 1984; January 1, 1982;

Pursuant to G.S. 150B-21.3A, rule is necessary without substantive public interest Eff. April 27, 2019;

Amended Eff. July 1, 2020.

 

21 NCAC 56 .1302             UNLAWFUL PRACTICE BY AN UNLICENSED PeRSON

(a)  General. Alleged unlawful practice by an unlicensed person shall be subject to Board investigation and enforcement, to include applying for relief by injunction or referral to an agency of the State for appropriate legal action.

(b)  Preferring Charges. Any person who believes that any person or business (party) is in violation of the acts specified in G.S. 89C may prefer charges against that person or business, in the form of a complaint, completed to the best of that individual's knowledge and belief, in the form of a complaint, along with providing corroborative evidence that helps support the charges. An optional complaint form is provided by the Board to aid in filing the complaint.

(c)  Preliminary Determination:

(1)           Upon receipt of a filed charge that meets requirements of G.S. 89C and the rules of the Board a case shall be opened. Other information indicating that a party is in violation of the provisions of G.S. 89C or the rules of the Board may be a basis for opening a case by the Board.

(2)           A field investigation may be performed if determined necessary by the Executive Director in order to obtain additional information and evidence.

(3)           If the Executive Director determines that charges are corroborated by evidence, a written notice and explanation of the charge shall be forwarded to the person or business against whom the charge is made and a response is requested, within 15 days, to show compliance with G.S. 89C. Notice of the charge and of the alleged facts or alleged conduct shall be given personally or by certified mail, return receipt requested.

(4)           After preliminary evidence has been obtained, the matter shall be referred to the Board's review committee, which is made up of the following individuals:

(A)          one member of the Board;

(B)          the legal counsel of the Board; and

(C)          the Executive Director of the Board or Assistant Executive Director if designated by the Executive Director.

(5)           Upon review of the available evidence, the review committee shall recommend to the Board that:

(A)          the investigation be continued and the party be notified with an explanation of the charge(s) and given an opportunity to provide a response to show compliance with G.S. 89C;

(B)          the charge be dismissed as unfounded or trivial;

(C)          a letter be issued informing of the possible violation of G.S. 89C and that further action may be pursued under G.S. 89C-23; or

(D)          the matter be referred to an appropriate agency for necessary legal action.

(d)  Board Decision. Notice of decision by the Board on recommendations of the review committee shall be given to the party submitting the charge.

 

History Note:        Authority G.S. 89C‑10; 89C‑23;

Eff. February 1, 1976;

Readopted Eff. September 29, 1977;

Amended Eff. August 1, 2011; August 1, 2000; August 1, 1998; May 1, 1994; April 1, 1989; January 1, 1982;

Pursuant to G.S. 150B-21.3A, rule is necessary without substantive public interest Eff. April 27, 2019;

Amended Eff. July 1, 2020.

 

SECTION .1400 ‑ CONTESTED CASES

 

21 NCAC 56 .1401             GENERAL RULES

Whenever the Board, by its official action, acts in such a way as to affect the rights, duties, or privileges of a specific identified party, that party, upon request, will be given an administrative hearing.

 

History Note:        Authority G.S. 89C‑10; 89C‑21; 89C‑22; 150B‑38;

Eff. February 1, 1976;

Readopted Eff. September 29, 1977;

Pursuant to G.S. 150B-21.3A, rule is necessary without substantive public interest Eff. April 27, 2019.

 

21 NCAC 56 .1402             OPPORTUNITY FOR LICENSEE OR APPLICANT TO HAVE HEARING

Every licensee or applicant for a license shall be afforded notice and an opportunity to be heard on any action, where the effect would be:

(1)           to deny permission to take an examination for licensing for which application has been duly made;

(2)           to deny a license based on comity;

(3)           to deny a license after an applicant has taken and passed an examination;

(4)           to require re‑examination for licensing;

(5)           to withhold the renewal of a license for any cause other than failure to pay a statutory renewal fee;

(6)           to suspend a license;

(7)           to revoke a license;

(8)           to impose a civil penalty;

(9)           to issue a reprimand;

(10)         to refuse to renew;

(11)         to refuse to reinstate; or

(12)         to require additional education.

 

History Note:        Authority G.S. 89C‑10; 89C‑21; 89C‑22; 150B‑38;

Eff. February 1, 1976;

Readopted Eff. September 29, 1977;

Amended Eff. August 1, 2014; April 1, 1989; January 1, 1982;

Pursuant to G.S. 150B-21.3A, rule is necessary without substantive public interest Eff. April 27, 2019.

 

21 NCAC 56 .1403             NOTICE OF CONTEMPLATED BOARD action to applicant: REQUEST FOR HEARING

When the Board takes an action specified in Subparagraphs (1), (2) or (3) of Rule .1402 of this Section, it shall give the applicant a written statement:

(1)           that the applicant failed to meet the qualifications to be examined or to be issued a license;

(2)           stating the specific deficiencies as to why the applicant failed; and

(3)           that unless the applicant, within 20 days after service of the notice, deposits in the mail a certified letter addressed to the Board and containing a request for a hearing, the Board's action will become final.

In any Board proceeding involving the denial of an application to take an examination, or refusal to issue a license after an applicant has taken and passed an examination, the burden of satisfying the Board of the applicant's qualifications shall be upon the applicant.

 

History Note:        Authority G.S. 89C‑10; 89C‑21; 89C‑22; 150B‑38;

Eff. February 1, 1976;

Readopted Eff. September 29, 1977;

Amended Eff. August 1, 1998; December 1, 1984; January 1, 1982;

Pursuant to G.S. 150B-21.3A, rule is necessary without substantive public interest Eff. April 27, 2019;

Amended Eff. July 1, 2020.

 

21 NCAC 56 .1404             REQUEST FOR HEARING

21 NCAC 56 .1405             NOTICE OF HEARING

 

21 NCAC 56 .1406             PLACE OF HEARING

21 NCAC 56 .1407             INTERVENTION

21 NCAC 56 .1408             HEARING OFFICERS

 

History Note:        Authority G.S. 89C‑10; 89C‑21; 89C‑22; 150A‑3; 150A‑23; 150A‑24; 150A‑32;

Eff. February 1, 1976;

Readopted Eff. September 29, 1977.

Amended Eff. December 1, 1984; January 1, 1982;

Repealed Eff. April 1, 1989.

 

21 NCAC 56 .1409             CONDUCT OF CONTESTED CASE

(a)  Failure to Appear:

(1)           If a party served with notice requests a hearing within the time required and fails to appear without having notified the Board, and no continuance or adjournment is ordered, the party is considered to have waived the right to appear at the hearing and the Board may proceed with the hearing in the party's absence.

(2)           If the absent party is the only party other than the Board, the Board may proceed with the hearing and make its decision in the party's absence.

(3)           Continuances and adjournments shall be granted to a party only in compelling circumstances and for hardship noted.

(4)           If a hearing is conducted or a decision reached in the absence of a party, that party may petition the Board for a reopening of the case. Petitions will not be granted, except when petitioner can show that the reasons for the failure to appear were justifiable and that fairness requires reopening of the case. The decision made by the Board will be in writing. A copy will be sent to the petitioner and made a part of the record of the contested case.

(b)  Simplification of Issues. The parties to a contested case may agree in advance to simplify the hearing by eliminating issues to be contested at the hearing, accepting the validity of certain proposed evidence, accepting the findings in some other case with relevance to the case at hand, or agreeing to such other matters as may expedite the hearing.

(c)  Subpoenas:

(1)           The executive director shall issue subpoenas in the Board's name.

(2)           Subpoenas requiring the attendance of witnesses, or those to produce documents, evidence, or things, will be issued by the executive director within five business days of the receipt of a request from a party to the case for such subpoena.

(3)           Any person receiving a subpoena from the Board may object thereto by filing a written objection to the subpoena with the Board. Such objection must include a concise, but complete statement of reasons why the subpoena should be revoked or modified. These reasons may include lack of relevancy of the evidence requested, lack of particularity in the description of the evidence sought, or any other reasons sufficient in law for holding the subpoena invalid, such as that the evidence is privileged, that appearance or production would be so disruptive as to be unreasonable in light of the significance of the evidence sought, or other undue hardships.

(4)           The objecting witness shall serve the objection on the party who requested the subpoena as soon as the objection is filed with the Board.

(5)           The party requesting the subpoena, within five days, may file a written response to the objection. The response shall be served in like manner as the objection.

(6)           After receipt of the objection and response thereto, if any, the Board shall issue a notice to the party who requested and the party challenging the subpoena, and may notify all other parties of an open hearing, to be scheduled as soon as practicable, at which time evidence and testimony may be presented limited to the questions raised by the objection and response, if any.

(7)           Promptly after the close of such hearing, the Board will rule on the challenge and issue a written decision. A copy of this decision will be issued to all parties and made a part of the record.

 

History Note:        Authority G.S. 89C‑10; 89C‑21; 89C‑22; 150B‑38; 150B‑39; 150B‑40;

Eff. February 1, 1976;

Readopted Eff. September 29, 1977;

Amended Eff. August 1, 2000; August 1, 1998; April 1, 1989; December 1, 1984; January 1, 1982;

Pursuant to G.S. 150B-21.3A, rule is necessary without substantive public interest Eff. April 27, 2019.

 

21 NCAC 56 .1410             DISCOVERY

 

History Note:        Authority G.S. 89C‑10; 89C‑21; 89C‑22; 150A‑28;

Eff. February 1, 1976;

Readopted Eff. September 29, 1977;

Repealed Eff. April 1, 1989.

 

21 NCAC 56 .1411             DEPOSITIONS

Depositions shall be taken in accordance with the North Carolina Rules of Civil Procedure.

 

History Note:        Authority G.S. 89C‑10; 89C‑21; 89C‑22; 150B‑39(a);

Eff. February 1, 1976;

Readopted Eff. September 29, 1977;

Amended Eff. August 1, 1998;

Pursuant to G.S. 150B-21.3A, rule is necessary without substantive public interest Eff. April 27, 2019.

 

21 NCAC 56 .1412             CONDUCT OF HEARING

 

History Note:        Authority G.S. 89C‑10; 89C‑21; 89C‑22; 150A‑25;

Eff. February 1, 1976;

Readopted Eff. September 29, 1977;

Amended Eff. January 1, 1982;

Repealed Eff. April 1, 1989.

 

21 NCAC 56 .1413             DECISION OF BOARD

(a)  Manner and Time of Rendering Decision. After a hearing has been completed the Board shall proceed to consider the case and as soon as practicable shall render their decision. The decision must be rendered within 90 days after the hearing.

(b)  Service of Written Decision. The Board shall serve upon each party a written copy of the decision, either personally or by certified mail. If the decision is sent by certified mail it shall be deemed to have been served on the date borne on the return receipt.

(c)  Final Decision. The final decision of the Board shall be in the manner and form prescribed by G.S. 150B-42(a).

(d)  Official Record. The official record shall be prepared in all contested cases in accordance with the requirements of G.S. 150B-42(b).

 

History Note:        Authority G.S. 89C-10; 89C-21; 89C-22; 150B-42;

Eff. February 1, 1976;

Readopted Eff. September 29, 1977;

Amended Eff. May 1, 2009; April 1, 1989; January 1, 1982;

Pursuant to G.S. 150B-21.3A, rule is necessary without substantive public interest Eff. April 27, 2019.

 

SECTION .1500 ‑ FEES

 

21 NCAC 56 .1501             GENERAL

Fees for returned checks shall be in the maximum amount established by G.S. 25-3-506.

 

History Note:        Authority G.S. 89C‑14; 89C‑17; 89C‑18;

Eff. May 1, 1989;

Amended Eff. August 1, 2000;

Pursuant to G.S. 150B-21.3A, rule is necessary without substantive public interest Eff. April 27, 2019.

 

section .1600 – standards of practice for land surveying in north carolina

 

21 NCAC 56 .1601             GENERAL

In order to better serve the general public in regulating the practice of land surveying in North Carolina, the minimum standards of practice set forth in this Section are established, and shall be observed by Professional Land Surveyors in the practice of land surveying.

 

History Note:        Authority G.S. 89C‑10; 89C‑20;

Eff. July 1, 1989;

Amended Eff. August 1, 2000;

Pursuant to G.S. 150B-21.3A, rule is necessary without substantive public interest Eff. April 27, 2019.

 

21 NCAC 56 .1602             SURVEYING PROCEDURES

(a)  A Professional Land Surveyor shall spend the necessary time and effort to make investigation to determine if there are encroachments, gaps, lappages, or other irregularities along each line surveyed. Points may be placed on the line from closed or verified traverses and the necessary investigations made from these points. If these investigations are not made, then the surveyor shall not certify to an actual survey of that line and the plat shall contain the appropriate qualifications in accordance with the rules in this Section.

(b)  Any and all visible or determined encroachments or easements on the property being surveyed shall be accurately located and indicated.

(c)  With respect to investigation of property boundaries and recorded easements, the surveyor shall examine the most recent deeds and recorded plats adjacent to the subject property as well as all deeds and plats recorded after the date of the deed or plat upon which the survey is being based (the survey reference deed or plat).

(d)  Except as provided in Paragraph (e) of the Rule, metal stakes or materials of comparable permanence shall be placed at all corners.

(e)  Where a corner falls in a right-of-way, tree, stream, or on a fence post, boulder, stone, or similar object, one or more monuments or metal stakes shall be placed in the boundary so that the inaccessible point may be located accurately on the ground and the map.

(f)  The results of a survey shall be reported to the user of that survey as a map or report of survey and, whether in written or graphic form, shall be prepared in a clear and factual manner. All reference sources shall be identified. Artificial monuments called for in such reports shall be described as found or set. When no monument is found or set for points described in Paragraph (e) of this Rule, that fact shall be noted.

(g)  Tie lines defined. Where the results of a survey are reported in the form of a plat or a written description, one or more corners shall, by a system of azimuths or courses and distances, be accurately tied to and coordinated with a horizontal control monument of some United States or State Agency survey system, such as the North Carolina Geodetic Survey, where such monument is within 2000 feet of the subject property, right-of-way, easement or other surveyed entity. Where the North Carolina grid system coordinates of said monument are on file in the Department of Public Safety, Emergency Management, Geodetic Survey office, the coordinates of both the referenced corner or point and the monument(s) shall be shown in X (easting) and Y (northing) coordinates on the plat or in the written description or document. The coordinates shall be identified as based on "NAD 83," indicating North American Datum of 1983 or as "NAD 27," indicating North American Datum of 1927. The datums of the National Geodetic Survey (NGS) are incorporated by reference including subsequent amendments and editions, and may be accessed free of charge at www.ngs.noaa.gov. The tie lines to the monuments shall be sufficient to establish true north or grid north bearings for the plat or description if the monuments exist in pairs. Control monuments within a previously recorded subdivision may be used in lieu of grid control. In the interest of bearing consistency with previously recorded plats, existing bearing control may be used where practical. In the absence of grid control, other natural or artificial monuments or landmarks shall be used. In all cases, the tie lines shall be sufficient to accurately reproduce the subject lands from the control or reference points used.

(h)  Area is to be computed by double meridian distance or equally accurate method and shown on the face of the plat, written description, or other document. Area computations by estimation, by planimeter, by scale, or by copying from another source are not acceptable methods, except in the case of tracts containing inaccessible areas and in these areas the method of computation shall be stated.

 

History Note:        Authority G.S. 89C-10; 89C-20;

Eff. July 1, 1989;

Amended Eff. August 1, 2014; August 1, 2012 (see S.L. 2012-143, s.1.(f)); September 1, 2011; May 1, 2009; August 1, 2000; August 1, 1998; February 1, 1996;

Pursuant to G.S. 150B-21.3A, rule is necessary without substantive public interest Eff. April 27, 2019.

 

21 NCAC 56 .1603             CLASSIFICATION OF BOUNDARY SURVEYS

General. "Boundary surveys" are defined as surveys made to establish or to retrace a boundary line on the ground, or to obtain data for constructing a map, plat, or report showing a boundary line. For the purpose of this Rule, the term refers to all surveys, including "loan" or "physical" surveys, that involve the determination or depiction of property lines. For the purpose of specifying minimum allowable surveying standards for boundary surveys, the following four general classifications of lands in North Carolina are established from the standpoint of their real value, tax value, or location. Each map shall contain a statement of the calculated ratio of precision before adjustments or a statement of positional accuracy.

(1)           Local Control Network Surveys (Class AA). Local control network surveys are traverse networks utilizing permanent points for the purpose of establishing local horizontal control networks for future use by local surveyors. For Class AA boundary surveys in North Carolina, the angular error of closure shall not exceed ten seconds times the square root of the number of angles turned. The ratio of precision shall not exceed an error of closure of one foot per 20,000 feet of perimeter of the parcel of land (1:20,000). When using positional accuracy standards for Class AA control and boundary surveys, neither axis of the 95 percent confidence level error ellipse for any control point or property corner shall exceed 0.05 feet or 0.015 meters plus 30 ppm measured relative to the position(s) of the horizontal control points used and referenced on the survey.

(2)           Urban Land Surveys (Class A). Urban surveys include lands that normally lie within a town or city. For Class A boundary surveys in North Carolina, the angular error of closure shall not exceed 20 seconds times the square root of the number of angles turned. The ratio of precision shall not exceed an error of closure of one foot per 10,000 feet of perimeter of the parcel of land (1:10,000). When using positional accuracy standards for Class A control and boundary surveys, neither axis of the 95 percent confidence level error ellipse for any control point or property corner shall exceed 0.10 feet or 0.030 meters plus 50 ppm measured relative to the position(s) of the horizontal control points or property corners used and referenced on the survey.

(3)           Suburban Land Surveys (Class B). Suburban surveys include lands in or surrounding the urban properties of a town or city. For Class B boundary surveys in North Carolina, the angular error of closure shall not exceed 25 seconds times the square root of the number of angles turned. The ratio of precision shall not exceed an error of closure of one foot per 7,500 feet of perimeter of the parcel of land (1:7,500). When using positional accuracy standards for Class B control and boundary surveys, neither axis of the 95 percent confidence level error ellipse for any control point or property corner shall exceed 0.12 feet or 0.037 meters plus 90 ppm measured relative to the position(s) of the horizontal control points or property corners used and referenced on the survey.

(4)           Rural and Farmland Surveys (Class C). Rural and farmland surveys include lands located in rural areas of North Carolina and generally outside the suburban properties. For Class C boundary surveys in North Carolina, the angular error of closure shall not exceed 30 seconds times the square root of the number of angles turned. The ratio of precision shall not exceed an error of closure of one foot per 5,000 feet of perimeter of the parcel of land (1:5,000). When using positional accuracy standards for Class C control and boundary surveys, neither axis of the 95 percent confidence level error ellipse for any control point or property corner shall exceed 0.15 feet or 0.046 meters plus 150 ppm measured relative to the position(s) of the horizontal control points or property corners used and referenced on the survey.

 

History Note:        Authority G.S. 89C‑10; 89C‑20;

Eff. July 1, 1989;

Amended Eff. August 1, 2014; May 1, 2009; August 1, 2000; August 1, 1998; November 2, 1992; January 1, 1992;

Pursuant to G.S. 150B-21.3A, rule is necessary without substantive public interest Eff. April 27, 2019;

Amended Eff. July 1, 2020.

 

21 NCAC 56 .1604             MAPPING REQUIREMENTS FOR BOUNDARY SURVEYS

(a)  The size of a map shall be such that all details are legible on a copy.

(b)  Any lines that are not actually surveyed shall be indicated on the map and a statement included revealing the source of information from which the line is derived.

(c)  All surveys based on the North Carolina grid system shall contain a statement identifying the coordinate system referenced datum used.

(d)  All plats (maps), unless marked as "Preliminary Plat ‑ Not for recordation, conveyances, or sales" shall be sealed, signed, and dated by the Professional Land Surveyor and shall contain the following:

(1)           An accurately positioned north arrow coordinated with any bearings shown on the plat. Indication shall be made as to whether the north index is true, magnetic, North Carolina grid ('NAD 83' and realization (date of adjustment of coordinate system) or 'NAD27'), or is referenced to old recorded deed or recorded plat bearings. If the north index is magnetic or referenced to old recorded deed or recorded plat bearings, the date and the source (note if not determined) shall be indicated.

(2)           The azimuth or courses and distances of every property line surveyed shall be shown. Distances shall be in feet or meters and decimals thereof. The number of decimal places shall be appropriate to the class of survey required in Rule .1603 of this Section.

(3)           All plat lines shall be horizontal or grid measurements. All lines shown on the plat shall be correctly plotted to the scale shown. Enlargements of portions of a plat are not required to be to scale. Where the North Carolina grid system is used, the combined grid factor shall be shown on the face of the plat. If grid distances are used, they shall be shown on the plat.

(4)           Where a boundary is formed by a curved line, the following data shall be given: actual survey data or a series of subchords with bearings and distances around the curve. If standard curve data is used, the bearing and distance of the long chord (from point of curvature to point of tangency) shall be shown on the face of the plat.

(5)           Where a subdivision of land is set out on the plat, all streets and lots shall be accurately plotted with dimension lines indicating widths and all other information pertinent to retracing all lines in the field. This shall include bearings and distances to form a continuous closure of the entire perimeter.

(6)           Control corners, and all other corners that are marked by monument or natural object shall be identified on all plats, and all corners of adjacent owners along the boundary lines of the subject tract that are marked by monument or natural object shall be shown.

(7)           The surveyor shall show one of the following (or note if could not be determined):

(A)          The names of adjacent land owners;

(B)          The lot, block, parcel, and subdivision designations; or

(C)          Other legal reference.

(8)           All visible and apparent rights-of-way, easements, watercourses, utilities, roadways, and other such improvements shall be accurately located where crossing or forming any boundary line of the property shown.

(9)           Tie lines as required and defined in Rule .1602(g) of this Section shall be accurately shown on the face of the plat, whether or not the plat is to be recorded.

(10)         A vicinity map (location map) shall appear on the face of the plat.

(11)         Each map shall contain:

(A)          the property designation;

(B)          the name of owner or prospective owner;

(C)          the location (including township, county, and State);

(D)          the date or dates the survey was conducted;

(E)           a scale of the drawing listed in words or figures;

(F)           a bargraph;

(G)          the title source; and

(H)          a legend depicting nomenclature or symbols not otherwise labeled.

(12)         Any map not certified for recording under G.S. 47-30, and all reports of survey, shall contain this certificate signed by the Professional Land Surveyor in substantially the following form:

"I certify that this map was drawn under my supervision from an actual survey made under my supervision (deed description recorded in Book ______, page ______ or other reference source ____________________); that the boundaries not surveyed are indicated as drawn from information in Book ______, page ______ or other reference source ____________________; that the ratio of precision or positional accuracy is ___________________; and that this map meets the requirements of The Standards of Practice for Land Surveying in North Carolina (21 NCAC 56. 1600)."

This ______ day of _______________, 2_____.

Seal                                                                        __________________________________________

Professional Land Surveyor

 

History Note:        Authority G.S. 89C‑10; 89C-16; 89C‑20;

Eff. July 1, 1989;

Amended Eff. August 1, 2014; May 1, 2009; August 1, 2000; August 1, 1998; February 1, 1996; November 2, 1992; January 1, 1992;

Pursuant to G.S. 150B-21.3A, rule is necessary without substantive public interest Eff. April 27, 2019;

Amended Eff. July 1, 2020.

 

21 NCAC 56 .1605             CLASSIFICATION OF VERTICAL CONTROL SURVEYS

(a)  General. Vertical control surveys are defined as measurements taken by surveying methods (differential leveling, trigonometric leveling, and global positioning surveys) to determine elevation with respect to vertical datum, usually National Geodetic Vertical Datum of 1929 (NGVD29) or North American Vertical Datum of 1988 (NAVD88). Global Position Surveys shall only be used to obtain Class C surveys. For the purpose of specifying minimum allowable surveying standards, the following three general classifications of vertical control surveys are established.

(1)           For Class A vertical control surveys in North Carolina, the vertical error in feet shall not exceed 0.10 times the square root of the number of miles run from the reference datum.

(2)           For Class B vertical control surveys in North Carolina, the vertical error in feet shall not exceed 0.20 times the square root of the number of miles run from the reference datum.

(3)           For Class C vertical control surveys in North Carolina, the vertical error in feet shall not exceed 0.30 times the square root of the number of miles run from the reference datum. The vertical error in global position surveys shall not exceed five centimeters relative to the referenced benchmark(s) at the 95 percent confidence level (2 sigma) accuracy as defined in Federal Geographic Data Committee Standards.

(b)  A certificate, substantially in the following form, shall be affixed to all maps or reports:

" I, ______________________, certify that this vertical control survey was completed to the Class ___ standard [(21 NCAC 56.1605(a)] under my direct and responsible charge from an actual survey made under my supervision."

 

History Note:        Authority G.S. 89C‑10; 89C‑20;

Eff. November 2, 1992;

Amended Eff. August 1, 2011; August 1, 2002; August 1, 2000;

Pursuant to G.S. 150B-21.3A, rule is necessary without substantive public interest Eff. April 27, 2019.

 

21 NCAC 56 .1606             SPECIFICATIONS FOR TOPOGRAPHIC AND PLANIMETRIC MAPPING, INCLUDING GROUND, AIRBORNE, AND SPACEBORNE SURVEYS

(a)  General.

(1)           "Topographic surveys" are defined as surveys that have as their major purpose the determination of the configuration (relief) of the earth (ground) and the location of natural or artificial objects thereon.

(2)           "Planimetric mapping" is defined as producing a map that presents the horizontal positions only for the features represented. This is distinguished from a topographic map by the omission of relief in measurable form.

(3)           "Airborne and spaceborne surveys" are defined as the use of photogrammetry, LIDAR, IFSAR, or other similar measurement technologies for obtaining reliable information about physical objects and the environment, including terrain surface, through the process of recording, measuring, and interpreting images and patterns of electromagnetic radiant energy and other phenomena. This Rule establishes minimum allowable photogrammetric production procedures and standards for photogrammetric mapping and digital data production.

(b)  Production procedures for topographic and planimetric mapping surveys shall be in accordance with the standards established by Part 3 of the Federal Geographic Data Committee (FGDC) Geospatial Positioning Accuracy Standard and applicable extensions and revisions. These standards are incorporated by reference including subsequent amendments and editions. The material is available from the FGDC at www.fgdc.gov at no cost. Reporting accuracy shall be in accordance with Part 1 of the FGDC geospatial standards.

(c)  Topographic or planimetric maps, orthophotos, and related electronic data, unless marked as "Preliminary Map," shall meet one of the below classes, as contractually specified to FGDC Standards, or National Agriculture Imagery Program of the US Department of Agriculture (NAIP) Standards, or to State adopted base mapping standards for horizontal and vertical accuracies. The NAIP imagery standards are incorporated by reference including subsequent amendments and editions and may be accessed free of charge at http://www.fsa.usda.gov/Internet/FSA_File/naip_info_sheet_2013.pdf. In the absence of a specified standard, the surveyor shall conform the survey to the requirements for a Class B survey.

(1)           For horizontal accuracy, the five general classifications are:

(A)          Class AA surveys. For Class AA surveys in North Carolina, the relative accuracy shall be equal to or no less than 0.033 meter (0.10 feet);

(B)          Class A surveys. For Class A surveys in North Carolina, the relative accuracy shall be equal to or less than 0.5 meter (1.64 feet);

(C)          Class B surveys. For Class B surveys in North Carolina, the relative accuracy shall be equal to or less than 1.0 meter (3.28 feet);

(D)          Class C surveys. For Class C surveys in North Carolina, the relative accuracy shall be equal to or less than 2 meters (6.56 feet); and

(E)           Class D surveys. For Class D surveys in North Carolina, the relative accuracy shall be equal to or less than 5 meters (16.40 feet).

(2)           For vertical accuracy, the three general classifications are:

(A)          Urban and suburban vertical control surveys (Class A). Urban and suburban vertical control surveys include lands that lie within or adjoin a town or city. For Class A vertical control surveys in North Carolina, the vertical error in feet shall not exceed 0.10 times the square root of the number of miles run from the reference datum.

(B)          Other vertical control surveys (Class B). Other vertical control surveys include all lands which are not covered by Class A as described in Part (A) of this Subparagraph. For Class B vertical control surveys in North Carolina, the vertical error in feet shall not exceed 0.20 times the square root of the number of miles run from the reference datum.

(C)          Trigonometric vertical control surveys (Class C). Trigonometric vertical control surveys shall be used for vertical control for aerial and topographic mapping. The vertical error in feet shall not exceed 0.3 times the square root of the number of miles run from the reference datum.

(d)  When the resulting product is a digital (electronic) data set, or a map or document that consists of more than one sheet or otherwise cannot be certified, a project report shall be certified. The report shall be marked "Preliminary" if applicable.

(e)  Ground control for topographic and planimetric mapping projects shall be in North Carolina State Plane Coordinate System grid coordinates and distances when the project is tied to grid. A minimum of one permanent project vertical control point shall be shown.

(f)  The project map or report shall contain the following information:

(1)           Date of original data acquisition;

(2)           Altitude of sensor and sensor focal length, as applicable;

(3)           Date of document or data set compilation;

(4)           If hard copy product is produced, the maps shall contain a north arrow, map legend, final document scale, including bargraph, and contour interval, as applicable;

(5)           Coordinate system for horizontal and vertical denoting SI or English units (i.e., NAD83, assumed, or other coordinate system);

(6)           A list or note showing the control points used for the project. The minimum data shown for each point shall include: physical attributes (e.g. iron rod, railroad spike), latitude and longitude (or X and Y Grid coordinates), and elevation, as applicable;

(7)           If other data is included, the source and accuracy of those items shall be indicated;

(8)           For topographic maps or data sets, contours in areas obscured by man-made or natural features shall be uniquely identified or enclosed by a polygon identifying the obscured area. The accuracies of the contours or of features in this obscured area shall be noted "No reliance is to be placed on the accuracy of these contours;"

(9)           A vicinity map depicting the project location on the first sheet of all hard copy maps or in the report accompanying digital files; and

(10)         The name of the client for whom the project was conducted.

(g)  Nothing in this Rule shall be construed to negate or replace the relative accuracy standards found in Rules .1601 through .1608 of this Section.

(h)  A certificate, substantially in the following form, shall be affixed to all maps or reports:

" I, ______________________, certify that this project was completed under my direct and responsible charge from an actual survey made under my supervision; that this_______________ (insert as appropriate: ground, airborne or spaceborne) survey was performed at the ___ percent confidence level to meet Federal Geographic Data Committee Standards; that this survey was performed to meet the requirements for a topographic/planimetric survey to the accuracy of Class ____ and vertical accuracy when applicable to the Class ___ standard, and that the original data was obtained on _____(date)__________; that the survey was completed on ___(date)_______; that contours shown as [broken lines] may not meet the stated standard; and all coordinates are based on____________________________ 'NAD 83' and realization (date of adjustment of coordinate system) or 'NAD 27' and all elevations are based on ________________ (NGVD 29, NAVD 88, or other)."

(i)  Documents transmitted electronically shall have the computer-generated seal removed from the original file and a copy of the project report shall be certified and sent to the client. The electronic data shall have the following inserted in lieu of the signature and date:

"This document originally issued and sealed by (name of sealer), (license number), on (date of sealing). This electronic media shall not be considered a certified document. See the project report for certificate and seal."

 

History Note:        Authority G.S. 89C-10; 89C-16; 89C-20;

Eff. November 2, 1992;

Amended Eff. August 1, 2014; August 1, 2011; May 1, 2009; August 1, 2002; August 1, 2000;

Pursuant to G.S. 150B-21.3A, rule is necessary without substantive public interest Eff. April 27, 2019.

 

21 NCAC 56 .1607             GLOBAL POSITIONING SYSTEMS SURVEYS

(a)  General. Global Navigation Satellite Systems (GNSS) is the generic name of navigation and positioning systems with global coverage that is comprised of GPS (Global Positioning System, United States, originally Navstar), GLONASS (Global Navigation Satellite System, Russia), Galileo (Europe), BDS (BeiDou Navigation Satellite System, China, also known as COMPASS), and any other satellite-based navigation and positioning systems that provide global coverage.

(b)  The Professional Land Surveyor in responsible charge of the GPS survey shall certify all prepared documents. When a map or document consists of more than one sheet, only one sheet must contain the certificate and all others must be certified. The certificate or metadata notes shall contain the following information:

(1)           Class of GPS survey as defined in the Standards of Practice (or list the sections);

(2)           Type of GPS field procedure, such as Static, Kinematic, Pseudo-Kinematic, Real-time Kinematic, Real-time Kinematic networks, and Online Position User Service;

(3)           Positional accuracy;

(4)           Dates of survey;

(5)           What datum and epoch coordinates or geographic positions are based on;

(6)           Designation of fixed-control stations and their positional data;

(7)           Geoid model used;

(8)           Combined grid factor(s); and

(9)           Units.

The certificate shall be substantially in the following form:

"I, ____________________, certify that this map was drawn under my supervision from an actual GPS survey made under my supervision and the following information was used to perform the survey:

(1)           Class of survey: _____________________________________________________

(2)           Positional accuracy: _________________________________________________

(3)           Type of GPS field procedure: __________________________________________

(4)           Dates of survey: ____________________________________________________

(5)           Datum/Epoch: ______________________________________________________

(6)           Published/Fixed-control use: ___________________________________________

(7)           Geoid model: ______________________________________________________

(8)           Combined grid factor(s): ______________________________________________

(9)           Units: ___________________________________________________________"

(c)  GPS surveys to provide control networks shall be performed in such a manner that it meets a 95 percent confidence level of the positional accuracy of each point relative to the published positions of the control points used and shall meet the accuracy standards of a Class AA survey as set out in Rule .1603.

(d)  GPS surveys performed to provide local horizontal or vertical Grid control on a parcel of land where the boundary or topography of that parcel will be shown relative to NC Grid horizontal or vertical datum shall be performed using techniques that will provide the standards of accuracy for the class of survey being performed while determining the horizontal or vertical positions of objects as set out in Rule .1603 or Rule .1606 as applicable.

(e)  Fixed station(s) used for the project shall appear on the map, plat, or report. The minimum data shown for each fixed station shall be station name, horizontal position (northing and easting) or latitude, longitude, elevation (ellipsoid or orthometric), and datum and epoch.

 

History Note:        Authority G.S. 89C‑10; 89C‑20;

Eff. November 2, 1992;

Amended Eff. August 1, 2011; May 1, 2009; August 1, 2002; August 1, 2000;

Pursuant to G.S. 150B-21.3A, rule is necessary without substantive public interest Eff. April 27, 2019;

Amended Eff. July 1, 2020.

 

21 NCAC 56 .1608             CLASSIFICATION/LAND INFORMATION SYSTEM/GEOGRAPHIC INFORMATION SYSTEM SURVEYS

(a)  General: "Land Information System/Geographic Information System (LIS/GIS)" surveys are defined as the measurement of existing surface and subsurface features for the purpose of determining their accurate geospatial location for inclusion in an LIS/GIS database. All LIS/GIS surveys as they relate to property lines, rights-of-way, easements, subdivisions of land, the position for any survey monument or reference point, the determination of the configuration or contour of the earth's surface or the position of fixed objects thereon, and geodetic surveying that includes surveying for determination of the size and shape of the earth both horizontally and vertically and the precise positioning of points on the earth utilizing angular and linear measurements through spatially oriented spherical geometry, shall be performed by a Land Surveyor who is a licensee of this Board unless exempt by G.S. 89C-25. For the purpose of specifying minimum allowable surveying standards, five general classifications of LIS/GIS surveys are established, any of which may be specified by the client. In the absence of a specified standard, the surveyor shall conform the survey to the requirements for a Class B survey.

(1)           For horizontal accuracy, the five general classifications are:

(A)          Class AA LIS/GIS Surveys. For Class AA LIS/GIS surveys in North Carolina, the relative accuracy shall be equal to or no less than 0.033 meter (0.10 feet);

(B)          Class A LIS/GIS surveys. For Class A LIS/GIS surveys in North Carolina, the relative accuracy shall be equal to or less than 0.5 meter (1.64 feet);

(C)          Class B LIS/GIS surveys. For Class B LIS/GIS surveys in North Carolina, the relative accuracy shall be equal to or less than 1.0 meter (3.28 feet);

(D)          Class C LIS/GIS surveys. For Class C LIS/GIS surveys in North Carolina, the relative accuracy shall be equal to or less than 2 meters (6.56 feet); and

(E)           Class D LIS/GIS surveys. For Class D LIS/GIS surveys in North Carolina, the relative accuracy shall be equal to or less than 5 meters (16.40 feet).

(2)           For vertical accuracy, the three general classifications are:

(A)          Urban and suburban vertical control surveys (Class A). Urban and suburban vertical control surveys include lands that lie within or adjoin a town or city. For Class A vertical control surveys in North Carolina, the vertical error in feet shall not exceed 0.10 times the square root of the number of miles run from the reference datum.

(B)          Other vertical control surveys (Class B). Other vertical control surveys include all lands which are not covered by Class A as described in Part (A) of this Subparagraph. For Class B vertical control surveys in North Carolina, the vertical error in feet shall not exceed 0.20 times the square root of the number of miles run from the reference datum.

(C)          Trigonometric vertical control surveys (Class C). Trigonometric vertical control surveys shall be used for vertical control for aerial and topographic mapping. The vertical error in feet shall not exceed 0.3 times the square root of the number of miles run from the reference datum. The vertical error in Global Navigation Satellite System (GNSS) surveys shall not exceed five centimeters relative to the referenced benchmark(s) at the 95 percent confidence level (2 sigma) accuracy as defined in Federal Geographic Data Committee Standards.

(b)  Nothing in this Rule negates or replaces the relative accuracy standards found in Rules .1601 through .1607 of this Section.

(c)  The Professional Land Surveyor in responsible charge of the LIS/GIS boundary or geodetic control survey shall certify all of the following in either written or digital form:

(1)           Class of LIS/GIS survey. The method of measurement used to evaluate the accuracy shall be described as either statistical testing or least squares adjustment results, comparison with values of higher accuracy, and repeat measurements. The reporting standard in the horizontal component is the radius of a circle of uncertainty, such that the true or theoretical location of the point falls within that circle 95 percent of the time;

(2)           Method of measurement (i.e. global navigation satellite systems, electronic scanners, theodolite and electronic distance meter, transit and tape);

(3)           Date(s) of the survey; and

(4)           Datum used for the survey.

(d)  A certificate, substantially in the following form, shall be affixed to all maps or reports:

"I, ______________________, certify that this project was completed under my direct and responsible charge from an actual survey made under my supervision; that this survey was performed to meet the requirements for an LIS/GIS survey [21 NCAC 56.1608] to the accuracy of Class ____ and vertical accuracy; when applicable to the Class ___ standard method used to evaluate the accuracy was _______________; method of measurement ______________; date(s) of survey ___________; datum used for survey __________; and all coordinates are based on ______________ ['NAD 83' and realization (date of adjustment of coordinate system) or 'NAD 27'] and all elevations are based on ________________ (NGVD 29, NAVD 88, or other)."

 

History Note:        Authority G.S. 89C-10; 89C-20;

Eff. February 1, 1996;

Amended Eff. August 1, 2014; August 1, 2011; July 1, 2009; May 1, 2009; August 1, 2002; August 1, 2000;

Pursuant to G.S. 150B-21.3A, rule is necessary without substantive public interest Eff. April 27, 2019.

 

21 NCAC 56 .1609             MINIMUM PHOTOGRAMMETRIC PRODUCTION STANDARDS

 

History Note:        Authority G.S. 89C-10; 89C-20;

Eff. August 1, 2000;

Repealed Eff. August 1, 2002.

 

SECTION .1700 – CONTINUING PROFESSIONAL COMPETENCY

 

21 NCAC 56 .1701             INTRODUCTION

Every licensee shall meet the continuing professional competency requirements of this Section for professional development as a condition for licensure renewal.

 

History Note:        Authority G.S. 89C-10(a); 89C-17;

Eff. December 1, 1994;

Amended Eff. August 1, 2000;

Pursuant to G.S. 150B-21.3A, rule is necessary without substantive public interest Eff. April 27, 2019.

 

21 NCAC 56 .1702             DEFINITIONS

Terms used in this Section are defined as follows:

(1)           Professional Development Hour (PDH) - A contact hour (nominal) of instruction or presentation. The common denominator for other units of credit.

(2)           Continuing Education Unit (CEU) - Unit of credit customarily used for continuing education courses. One continuing education unit equals 10 contact hours of instruction or presentation.

(3)           College or Unit Semester or Quarter Hour - Credit for Accreditation Board for Engineering and Technology approved course or other related college course.

(4)           Course or Activity - Any course or activity with a purpose and objective which will maintain, improve, or expand the skills and knowledge relevant to the licensee's field of practice.

(5)           Dual Licensee - A person who is licensed as both an engineer and a land surveyor.

(6)           Sponsor - Organization or individual that has supplied information on a form prescribed and furnished by the Board with respect to the organization or individual's ability to provide instruction in "for credit" courses. Courses offered by those designated as "Sponsor" must contain a purpose and objective, and result in the maintenance, improvement, or expansion of skills and knowledge relevant to a licensee's field of practice.

(7)           Ethics or Rules of Professional Conduct - A course or activity with content areas concerning:

(a)           the awareness of ethical concerns and conflicts;

(b)           an enhanced familiarity with codes of conduct;

(c)           an understanding of standards of practice or care;

(d)           project management and risk-assessment management; or

(e)           other similar topics aimed at maintaining, improving, or expanding the skill sets and knowledge relevant to conducting the practice of the profession so as to protect the health, safety, and welfare of the public.

(8)           Standards of Practice for Land Surveying - A course or activity with content areas related to Standards of Practice for Land Surveying in Section .1600 of this Chapter.

 

History Note:        Authority G.S. 89C-10(a); 89C-17; 89C-20

Eff. December 1, 1994;

Amended Eff. May 1, 2009; August 1, 2000;

Pursuant to G.S. 150B-21.3A, rule is necessary without substantive public interest Eff. April 27, 2019;

Amended Eff. March 1, 2023.

 

21 NCAC 56 .1703             REQUIREMENTS

Every licensee shall obtain 15 PDH units during the renewal period. Effective as of the 2024 license renewal, for all licensees at least 1 PDH shall be in Ethics or Rules of Professional Conduct. In addition, for Professional Land Surveyors 1 PDH shall be in the Standards of Practice for Land Surveying. If a licensee exceeds the annual requirement in any renewal period, a maximum of 15 PDH units may be carried forward into the subsequent renewal period. Selection of courses and activities that meet the requirements of Rule .1702(4) of this Section is the responsibility of the licensee. Post evaluation of the courses that are documented as required by Rule .1706 of this Section for compliance with Rules .1702, .1703, .1704, and .1705 of this Section may result in non-acceptance by the Board. PDH units may be earned as follows:

(1)           Completion of college courses;

(2)           Completion of continuing education courses, seminars, or workshops;

(3)           Completion of correspondence, televised, Internet, videotaped, audiotaped, and other courses or tutorials, provided an exam is required for completion. No exam is required for attendance at a webinar presentation if attendance is documented;

(4)           Presenting or attending seminars, in-house courses, workshops, or professional or technical presentations made at meetings, conventions or conferences;

(5)           Teaching or instructing in Items (1) through (4) of this Rule;

(6)           Authoring published papers, articles, or books;

(7)           Active participation in professional or technical societies or accrediting organizations as defined in Rule .1705(f) of this Section;

(8)           Patents;

(9)           Authoring exam questions accepted for use in the engineering or land surveying exams; or

(10)         Active participation on boards, commissions, committees or councils of private, local, state or federal government entities as defined in Rule .1705(g) of this Section; or

(11)         Active participation in educational outreach activities pertaining to professional licensure or the surveying/engineering professions that involve K–12 or higher education students as defined in Rule .1705(h) of this Section.

 

History Note:        Authority G.S. 89C-10(a); 89C-17;

Eff. December 1, 1994;

Amended Eff. August 1, 2014; August 1, 2011; May 1, 2009; August 1, 2000; August 1, 1998;

Pursuant to G.S. 150B-21.3A, rule is necessary without substantive public interest Eff. April 27, 2019;

Amended Eff. March 1, 2023.

 

21 NCAC 56 .1704             UNITS

The conversion of units of credit set forth in Rule .1703 of this Section to PDH units is as follows:

(1)           1 College or unit semester hour.

45 PDH

(2)           1 College or unit quarter hour.

30 PDH

(3)           1 Continuing Education Unit.

10 PDH

(4)           1 Contact hour of professional development in course work, seminars, or professional or technical presentations made at meetings, conventions or conferences, and for correspondence, televised, Internet, videotaped, audiotaped, and other courses or tutorials. Contact hours equal the actual time of instruction and shall be credited to the nearest one-third of an hour.

1 PDH

(5)           For teaching in Items (1) – (4) of this Rule, PDH credits are doubled. Teaching credit is valid for teaching a course or seminar for the first time only. Teaching credit does not apply to full-time faculty, as defined by the institution where a licensee is teaching.

(6)           Each published paper, article or book.

10 PDH

(7)           Active participation in professional or technical societies or in accrediting organizations as defined in Rule .1705(f) of this Section. (Each society or organization)

2 PDH

(8)           Each patent.

10 PDH

(9)           Each question used.

2 PDH

(10)         Active participation on boards, commissions, committees or councils of private, local, state or federal government entities as defined in Rule .1705(g) of this Section. (Each entity)

2 PDH

(11)         Active participation in educational outreach activities pertaining to professional licensure or the surveying/engineering professions that involve K–12 or higher education students as defined in Rule .1705(h) of this Section. (Each hour)

1 PDH

(not to exceed 3 PDHs)

 

History Note:        Authority G.S. 89C-10(a); 89C-17;

Eff. December 1, 1994;

Amended Eff. August 1, 2014; May 1, 2009; August 1, 2000; August 1, 1998;

Pursuant to G.S. 150B-21.3A, rule is necessary without substantive public interest Eff. April 27, 2019;

Amended Eff. March 1, 2023.

 

21 NCAC 56 .1705             DETERMINATION OF CREDIT

(a)  Approval of courses, sponsors, credit, PDH value for courses, and other methods of earning credit shall meet Rule .1702(4) of this Section.

(b)  Credit for college or community college courses shall be based upon course credit established by the college.

(c)  Credit for continuing education courses, seminars and workshops shall be based on one PDH unit for each hour of attendance. Attendance at programs presented at professional and technical society meetings shall earn PDH units for the actual time of each program.

(d)  Credit for correspondence, televised, Internet, videotaped, audiotaped, and other courses or tutorials, provided an exam is required for completion, shall be based upon one PDH unit for each hour assigned to the course, provided such hours reflect the course material and content required of the professional to complete the course.

(e)  Credit determination for published papers, articles and books and obtaining patents is the responsibility of the licensee to support and document the hours reported in compliance with the rules of this Section.

(f)  Credit for active participation in professional or technical societies or accrediting organizations (limited to 2 PDH per society or organization), requires that a licensee serve as an officer or participate as a member and contribute to the work of a committee of the society, or for accrediting organizations serve as an officer or participate in a committee or accreditation visits. PDH credits are not earned until the end of each year of service is completed.

(g)  Credit for active participation on boards, commissions, committees or councils of private, local, state or federal government entities (limited to 2 PDH per entity) requires utilizing engineering or land surveying knowledge (as applicable) in the participation. PDH credits are not earned until the end of each year of service is completed.

(h)  Credit for active participation in educational outreach activities by providing education about professional licensure or the surveying and engineering professions that involve K–12 or higher education students (limited to 3 PDH).

 

History Note:        Authority G.S. 89C-10(a); 89C-17;

Eff. December 1, 1994;

Amended Eff. August 1, 2014; August 1, 2011; May 1, 2009; August 1, 2000; August 1, 1998;

Pursuant to G.S. 150B-21.3A, rule is necessary without substantive public interest Eff. April 27, 2019;

Amended Eff. March 1, 2023.

 

21 NCAC 56 .1706             RECORDKEEPING

The licensee shall maintain the following records to be used to support credits claimed:

(1)           a log showing the type of activity claimed, title or specific subject, sponsoring organization, location, duration, date, instructor's or speaker's name, and PDH credits earned, and other information on a form as prescribed by the Board; and

(2)           attendance verification records in the form of completion certificates, or other documents supporting evidence of attendance.

These records must be maintained for a period of three years and copies may be requested by the board for audit verification purposes. The Board shall approve other records that contain the information required by this Rule.

 

History Note:        Authority G.S. 89C-10(a); 89C-17;

Eff. December 1, 1994;

Amended Eff. May 1, 2009; August 1, 2000;

Pursuant to G.S. 150B-21.3A, rule is necessary without substantive public interest Eff. April 27, 2019.

 

21 NCAC 56 .1707             EXEMPTIONS

A licensee is exempt from the professional development educational requirements for the following reasons:

(1)           New licensees by way of examination or comity are exempt for their first renewal period.

(2)           If currently licensed by and in good standing (license is not suspended or revoked) with the Board a licensee who is serving in the armed forces of the United States and who is eligible for an extension of time to file a tax return pursuant to G.S. 105-249.2 is granted a waiver of the mandatory continuing education requirements for the time period disregarded pursuant to the Internal Revenue Code 26 U.S.C. 7508.

The licensee shall request the waiver as follows:

(a)           The licensee shall notify the Board of eligibility before the current license expires. Upon such notification, the Board shall maintain the license in active status through the extension period.

(b)           If the licensee fails to notify the Board of eligibility for the extension period before the current license expires, upon receipt and acceptance of a renewal application within the extension period and presentation of proof that the licensee was eligible on the date that is the deadline for renewal, the expired license or registration shall be deemed retroactively to have not expired.

(c)           The licensee who submits a renewal application within the extension period shall not be deemed to hold a lapsed license subject to reinstatement fees.

(d)           The licensee may renew the license within the extension period despite failing to complete the specified continuing education requirements.

(e)           A licensee shall provide proof of eligibility for the extension period when the licensee or registrant submits the renewal application.

A request shall be administratively approved by the Executive Director, without waiting for the next regular meeting of the Board at which time the action shall be reported to the Board for final approval.

(3)           The Board shall exempt a licensee if the Board determines that the licensee is experiencing physical disability, illness, or other extenuating circumstances that prevent the licensee from obtaining professional development hours. Supporting documentation must be furnished to the Board. A request shall be administratively approved by the Executive Director, without waiting for the next regular meeting of the Board at which time the action shall be reported to the Board for final approval.

(4)           Licensees who list their occupation as "Inactive" on the Board approved renewal form and who are no longer providing professional engineering or land surveying services are exempt from the professional development hours required. In the event such a person elects to return to active practice of professional engineering or land surveying, professional development hours must be earned in accordance with the requirements of Rule .1708 in this Section before returning to active practice for each year exempted not to exceed the annual requirement for two years.

 

History Note:        Authority G.S. 89C-10(a); 89C-17; 93B-15;

Eff. December 1, 1994;

Amended Eff. August 1, 2011; May 1, 2009; August 1, 2000; February 1, 1996;

Pursuant to G.S. 150B-21.3A, rule is necessary without substantive public interest Eff. April 27, 2019;

Amended Eff. March 1, 2023.

 

21 NCAC 56 .1708             REINSTATEMENT

A licensee may bring an inactive license to active status by obtaining all delinquent PDH units. However, if the total number required to become current exceeds 30, then 30 shall be the maximum number required. Reinstatement of a license that was not renewed within 12 months after expiration (archived license), in addition to a new application, requires obtaining all delinquent PDH units as required to reinstate an inactive license.

 

History Note:        Authority G.S. 89C-10(a); 89C-17;

Eff. December 1, 1994;

Amended Eff. August 1, 2002; August 1, 2000; February 1, 1996;

Pursuant to G.S. 150B-21.3A, rule is necessary without substantive public interest Eff. April 27, 2019.

 

21 NCAC 56 .1709             COMITY/OUT-OF-JURISDICTION RESIDENT

Licensees who are residents of jurisdictions other than North Carolina shall meet the CPC requirements of their resident jurisdiction. If the licensee resides in a jurisdiction that has no continuing professional competency (CPC) requirement, or the licensee is exempt from the CPC requirement in the licensee's resident jurisdiction, the licensee must meet the requirements of North Carolina.

 

History Note:        Authority G.S. 89C-10(a); 89C-17;

Eff. December 1, 1994;

Amended Eff. May 1, 2009; August 1, 2000;

Pursuant to G.S. 150B-21.3A, rule is necessary without substantive public interest Eff. April 27, 2019.

 

21 NCAC 56 .1710             DUAL licenseEs

The number of PDH units required shall remain the same for persons who hold a second license as engineer or land surveyor. Holders of a second license must obtain a minimum of one-third of the total PDH requirements in each field. The remaining one-third requirement may be obtained in either field at the sole discretion of the licensee.

 

History Note:        Authority G.S. 89C-10(a); 89C-17;

Eff. December 1, 1994;

Amended Eff. July 1, 2009;

Pursuant to G.S. 150B-21.3A, rule is necessary without substantive public interest Eff. April 27, 2019.

 

21 NCAC 56 .1711             FORMS

Renewal applications may require the completion of a continuing education form specified by the board outlining PDH credit claimed. The licensee must supply sufficient detail on the form to permit audit verification, must certify and sign the continuing education form, and submit the form with the renewal application and fee.

 

History Note:        Authority G.S. 89C-10(a); 89C-17;

Eff. December 1, 1994;

Amended Eff. July 1, 2009; August 1, 1998;

Pursuant to G.S. 150B-21.3A, rule is necessary without substantive public interest Eff. April 27, 2019.

 

21 NCAC 56 .1712             COMPLIANCE

(a)  Compliance with annual Continuing Professional Competency (CPC) requirements shall be determined through an audit process conducted by the Board. Determination of individuals to be audited shall be accomplished through a random selection process or as the result of information available to the Board. Individuals selected for auditing shall provide the Board with the following documentation of the CPC activities claimed for the renewal period:

(1)           Attendance verification records in the form of transcripts, completion certificates, other documents supporting evidence of attendance, and a log as defined in Rule .1706 of the Section; and

(2)           Information regarding course content, instructors and sponsoring organization, for activities presented by other than approved sponsors as defined in Rule .1713 of this Section.

(b)  Attendance records shall be maintained by individual licensees for a period of three years for audit verification purposes.

 

History Note:        Authority G.S. 89C-10(a); 89C-17;

Eff. December 1, 1994;

Amended Eff. May 1, 2009; February 1, 1996;

Pursuant to G.S. 150B-21.3A, rule is necessary without substantive public interest Eff. April 27, 2019.

 

21 NCAC 56 .1713             SPONSORS

(a)  The Board may approve sponsors of Continuing Professional Competency (CPC) activities. The Board may maintain a list of sponsors which have agreed to conduct programs in accordance with the standards of CPC activities set forth in 21 NCAC 56. 1700. Such sponsors shall indicate their agreement with the requirements by executing a Sponsor Agreement on a form provided by the Board. These sponsors shall be designated as "Approved Sponsors" based upon approval by the Board of the sponsor application and payment of a one hundred fifty dollar ($150.00) application fee. The application form contains the following:

(1)           Name of applicant, contact name, mailing and physical address, phone number, and email address;

(2)           Type of organization;

(3)           Delivery of course type(s), program offerings (to public or in-house);

(4)           Offered to Professional Engineers or Professional Land Surveyors, or both;

(5)           Example of certificate of completion that attests to attendance;

(6)           Summary of qualifications of organization;

(7)           Types (subjects) of courses offered;

(8)           Sample course outline(s); and

(9)           Qualifications of course instructor(s)

(b)  By entering into an agreement with the Board to be designated as an "Approved Sponsor," the sponsor shall agree to the following terms as the sole terms of the agreement:

(1)           Allow persons designated by this Board to attend any or all courses, without fee or charge, for the purpose of determining that said course meets the standards of the Board;

(2)           Allow persons designated by this Board to review course material for the purpose of determining that the course meets the standards of the Board;

(3)           State in every brochure, publication or announcement concerning the course, the general content of the course and the specific knowledge or skill to be taught or addressed, as well as the credit to be earned in Professional Development Hours (PDH);

(4)           Ensure that the instructors or presenters of the course or program are qualified by education, training or experience to teach the subject matter;

(5)           Provide persons completing the course with written documentation attesting to that person's attendance to the course, as well as the name of the course, the date and location held, the instructor's name and the number of PDHs earned;

(6)           Provide attendees an evaluation form as provided by the Board that is to be collected and retained for audit by the Board;

(7)           Have a visible, continuous and identifiable contact person who is charged with the administration of the sponsor's CPC program and who has the responsibility for assuring and demonstrating to the Board compliance with this Rule, as well as for any other organization working with the sponsor for the development, distribution or presentation of CPC courses or activities; and

(8)           Retain for a period of three years a copy of the documentation required by this Paragraph.

(c)  Sponsors shall renew annually on a form provided by the Board.

(d)  Failure of an approved sponsor to comply with the terms of the CPC sponsor agreement is grounds for the Board to revoke, suspend or terminate the agreement, to remove the sponsor's name from the list of approved sponsors and to notify the public of such action. A sponsor that is given notice of revocation, suspension or termination may request an administrative hearing to be conducted as provided in 21 NCAC 56 .1400 Contested Cases.

(e)  Approval of a sponsor is equivalent to the language of licensing a sponsor in G.S. 89C-10(h).

 

History Note:        Authority G.S. 89C-10; 89C-17;

Eff. February 1, 1996;

Amended Eff. August 1, 2011; July 1, 2009; August 1, 2002;

Pursuant to G.S. 150B-21.3A, rule is necessary without substantive public interest Eff. April 27, 2019;

Amended Eff. March 1. 2023.